Back to Top
- Alternative Suchbegriffe
- arten class en list
- arten code en list
- Verwandte Suchbegriffe
- liste vgb-standars
- liste vgb standard
- liste vgb standards
- list vgb standards
- list vgb standard
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Invitation to Tender Criteria for Heat Recovery Steam Generators Downstream of Gas Turbines - ebookM222e-ebookUpon the initiative of the VGB Committee “Steam Generators“ a special working group was founded to establish criteria for invitations to tender of heat recovery steam generators downstream of gas turbines. *Dieses Produkt ist ebenfalls i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - PrintVGB-S-503-00-2017-06-ENOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - ebookVGB-S-503-00-2017-06-EN-ebookOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Konsenquenzen für die Löschwasserrückführung aus VAwS und LöRüRL beim Lagern von wassergefährdenden Stoffen - ebookM115ebookDie beste Art, Löschwasser zurückzuhalten, ist die, es erst gar nicht einzusetzen. Diese Prämisse ist eine der Grundlagen aller Gesetzeswerke über den Brandschutz. Bei allen Bemühungen, bereits eine Brandentstehung zu verhind Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - ebookVGBE-S-010-00-2023-08-EN-ebookvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - PrintVGBE-S-010-00-2023-08-ENvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - PrintVGB-S-015-2011-ENThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Type, Operation and Maintenance of Flue Gas Desulphurisation Plants (FGD) - ebookVGB-S-015-2011-EN-ebookThis VGB-Standard deals with flue gas desulphurisation (FGD) in large combustion plants. At this point, no additive processes, which can be employed in combustion, are considered. Here, only plants downstream of combustion are considered. The aim of Mehr erfahren160,00 €171,20 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Coal Handling in Power Plants - ebookM211e-ebookThe VGB Instruction Sheet “Coal Handling in Power Plants” contains a collection of experience and recommendations which was prepared to the best of our knowledge but cannot always completely reproduce the state of the art. It provides a s Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.