Back to Top
- Verwandte Suchbegriffe
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur wärmekraftwerke
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur warmekraftwerken
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung fur warmekraftwerk
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung fur warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung fur wärmekraftwerke
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guideline for the Testing of DeNOx-catalysts - ebookVGB-S-302-00-2013-04-EN-ebookThe purpose of this VGB-Standard is to manifest a testing procedure, which can be employed by catalyst manufacturers, SCR equipment suppliers, power plant operatorsand independent testing institutions for determining the characteristics of SCR c Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - PrintVGB-S-503-00-2017-06-ENOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - ebookVGB-S-503-00-2017-06-EN-ebookOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Standards for professional leadership behaviour - ebookVGB-S-041-00-2016-04-EN-ebookRather than sharing generally known theories and fundamentals on leadership behaviour, the VGB-Standard VGB-S041 is meant to serve as a basis for operator-specific requirements for leadership behaviour and focus content-wise on essential tasks of man Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - PrintVGB-S-014-2011-ENAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebookVGB-S-002-03-2019-10-EN-ebookThis VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the use Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.