Back to Top
- Alternative Suchbegriffe
- de en 62271 2015 vdew 01 2012 23 08
- de en 62271 2023 vdew 01 2012 23 08
- Verwandte Suchbegriffe
- vdew 04 3 2010 03
- vdew 002 3 2012 03
- vdew 00 3 222 03
- vdew 00 3 2.2 03
- vdew 007 3 2012 03
-
KKS Pocketbook, English, 4th edition - PrintVGBE-S-811-91-2021-12-EN/VGB-B-105-007.4eThe 4th edition of the KKS Pocketbook (KKS - Kraftwerk-Kennzeichensystem/Identification System for Power Stations) for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-811-91-2021-09-EN.The 201 Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren - PrintVGB-S-165-00-2014-07-DEDer VGB-Standard "Empfehlungen zur Verbesserung der H2-Sicherheit wasserstoffgekühlter Generatoren" hat das Ziel, Hinweise für das Planen, Errichten, Modernisieren und Betreiben von wasserstoffgekühlten Generatoren in Kraftwerksanlagen Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Prüfung von großen Schmiede- und Gussstücken für Dampf- und Gasturbosätze - ebookVGB-S-504-00-2015-12-DE-ebookDer sichere Betrieb und eine gute Verfügbarkeit von Turbinenanlagen stellen hohe Anforderungen an die Zuverlässigkeit und damit an die Qualität der eingesetzten Komponenten. Die Sammlung und Auswertung von Erfahrungen bei der Herstellu Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - PrintVGB-S-823-33-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - ebookVGB-S-823-33-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - Schlüsselteil: Funktionsschlüssel, Aggregateschlüssel, Betriebsmittelschlüssel - als Excel-Liste (Deutschsprachige Ausgabe)KKS-Basis-EXCEL-DEDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Kraftwerkssysteme (Systemschlüssel) - Excel-Liste (Deutschsprachige Ausgabe)RDS-PP-EXCEL-DEDie internationalen Grundnormen zur Referenzkennzeichnung bieten den Anwen-dern allgemeingültige Grundregeln und Kennbuchstaben für Hauptklassen zur Kenn-zeichnung von technischen Objekten und deren Dokumentation. Die Fachnorm für Kra Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Maschinentechnischer Blockschutz für Wärmekraftwerke - ebookR117ebookDie Richtlinie hat das Ziel, Empfehlungen für die Auslegung, Ausführung und Prüfung von Schutzeinrichtungen zu geben . Sie enthält eine Zusammenstellung von Zuverlässigkeitsanforderungen an die Gerätetechnik und Anforder Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key / ENGLISH) - PrintVGB-S-821-00-2016-06-ENThe basic international standards for reference designation provide users with generally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants estab Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - PrintVGB-S-036-00-2017-04-ENThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebookVGB-S-036-00-2017-04-EN-ebookThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten KraftwerkenVGB-S-109-00-2012-08-DE-ENDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebookVGB-S-823-41-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung - ebookVGB-S-831-00-2015-05-DE-ebookErsetzt durch mehrteilige Serie VGBE-S-831; weiterhin lieferbar für Bestandspflege. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) Der VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anlagendaten, Dokument Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.