Back to Top
- Alternative Suchbegriffe
- de en 62271 204 vdew 03 2012 2014 08
- de en 62271 2014 vdew 03 2012 204 08
- Verwandte Suchbegriffe
- vdew 006 3 2012 03
- vdew 06 3 2010 03
- vdew 07 3 2003 03
- vdew 07 3 2012 03
- vdew 00 3 2015 03
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - ebookVGB-S-034-00-2014-10-EN-ebookThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - PrintVGB-S-164-13-2021-03-DEDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Instandhaltungsgerechte Dokumentationen - ebookVGB-S-029-S-00;2012-03-DE-ebookAn die Instandhaltung von konventionellen Energieerzeugungsanlagen wird zunehmend die Anforderung höchster Wirtschaftlichkeit bei möglichst steigender Qualität gestellt. Mit diesem VGB-Standard sollen Empfehlungen ausgesprochen werden, Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - ebookVGB-S-164-13-2021-03-DE-ebookDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Instandhaltungsgerechte Dokumentationen - PrintVGB-S-029-S-00;2012-03-DEAn die Instandhaltung von konventionellen Energieerzeugungsanlagen wird zunehmend die Anforderung höchster Wirtschaftlichkeit bei möglichst steigender Qualität gestellt. Mit diesem VGB-Standard sollen Empfehlungen ausgesprochen werden, Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Anwendung der Messdatenvalidierung gemäß VDI 2048 - PrintVGB-S-009-S-00;2012-03.DEIm Zusammenhang mit IT-Lösungen zur Optimierung technischer Prozesse in Industriebetrieben wird oftmals das Stichwort „Messdatenvalidierung“ genannt. Tatsächlich ist die Messdatenvalidierung nach VDI 2048 ein interessantes und t Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Anwendung der Messdatenvalidierung gemäß VDI 2048 - ebookVGB-S-009-S-00;2012-03.DE-ebookIm Zusammenhang mit IT-Lösungen zur Optimierung technischer Prozesse in Industriebetrieben wird oftmals das Stichwort „Messdatenvalidierung“ genannt. Tatsächlich ist die Messdatenvalidierung nach VDI 2048 ein interessantes und t Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Brennstoffmahlanlagen - PrintVGBE-S-213-00-2024-04-DEBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - ebookVGBE-S-213-00-2024-04-DE-ebookBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Standard für die internen Rohrleitungen von Turbinenanlagen - PrintVGB-S-503-00-2017-06-DEMit der VGB-Richtlinie VGB-R-503 sind über eine längere Zeit Erfahrungen gesammelt worden, die in der vorliegenden Ausgabe des VGB-Standards VGB-S-503-00- 2017-06-DE Berücksichtigung gefunden haben. Mehr erfahren390,00 €417,30 € Inkl. MwSt.



















