Back to Top
- Verwandte Suchbegriffe
- 978 3 86875 2015 2
- 978 3 86875 00 5
- 978 3 86875 07 5
- 978 3 96284 2014 1
- 978 3 86875 06 5
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Availability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Availability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
KKS-Anwendungserläuterungen für Wasserkraftanlagen - ebookB106D1-ebookDas Kraftwerk-Kennzeichensystem KKS soll eine Einheitlichkeit der Kennzeichnung in allen Fachbereichen (Maschinen- und Anlagentechnik, Elektrotechnik, Leittechnik, Bautechnik), für alle wesentlichen Bestandteile der Gesamtanlage (Kraftwerk, Wehr Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
KKS-Anwendungserläuterungen für Wasserkraftanlagen - PrintB106D1Das Kraftwerk-Kennzeichensystem KKS bietet in seinem von VGB PowerTech veröffentlichten Regelwerk (Richtlinien, Schlüsselteile und Anwendungserläuterungen) Freiräume für Kennzeichnungsmöglichkeiten, so auch im Hinblick a Mehr erfahren64,00 €68,48 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.



















