Back to Top
- Alternative Suchbegriffe
- de en 62271 20 vdew 06 20 20 08
- Verwandte Suchbegriffe
- vdew 006e 3 2010 03
- vdew 006 3 2010 03
- vdew 09 3 2010 03
- vdew 00 3 2010 03
- vdew 004 3 2010 03
-
Assessment of fatigue loaded components in hydro power plants - ebookVGB-S-034-00-2014-10-EN-ebookThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Allgemeiner Teil / Provision of Technical Documentation for Energy Supply Units - General Part - ebookVGBE-S-831-01-2025-04-DE-EN-ebookDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Allgemeiner Teil / Provision of Technical Documentation for Energy Supply Units - General Part - PrintVGBE-S-831-01-2025-04-DE-ENDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Konservierung von Dampf- und Gasturbosätzen - 2. Auflage - PrintVGB-S-036-00-2017-04-DEIn dem VGB-Standard S-036 wird auf alle Aspekte der Konservierung eingegangen. Er gibt den Betreibern, Herstellern und Planern eine Basis, wie und in welchem Umfang die Dampfturbinen, Gasturbinen und Generatoren zu behandeln sind. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Konservierung von Dampf- und Gasturbosätzen [2. Auflage] - ebookVGB-S-036-00-2017-04-DE-ebookIn dem VGB-Standard S-036 wird auf alle Aspekte der Konservierung eingegangen. Er gibt den Betreibern, Herstellern und Planern eine Basis, wie und in welchem Umfang die Dampfturbinen, Gasturbinen und Generatoren zu behandeln sind. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - ebookVGB-S-221-00-2014-06-EN-ebookVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Concept of (recurrent) training for performance of non-routine activities in German NPPs - ebookVGB-S-043-00-2016-06-EN-ebookOn the basis of the established practices in German nuclear power plants, and making allowance from the VGB “Concept for the Implementation of Tools for Professional Conduct”, the WG has worked out the principles for such training (target Mehr erfahren150,00 €160,50 € Inkl. MwSt.
-
KKS Identification System for Power Plants (English, ebook, new edition available) - ebookB105e-ebookThe Identification System for Power Stations "KKS" serves to identify plants, sections of plants and items of equipment in any type of power station according to task, type and location. It is to be used by all engineering disciplines for planning, l Mehr erfahren550,00 €588,50 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke | Pocketbook, Lizenzierung, Übersicht, kostenlos - ebookrds-pp000Das RDS-PP® Pocketbook für konventionelle, nukleare und erneuerbare Energieanlagen sowie Speicher und Power-2-X ist in 2. Auflage als Aktualisierung VGBE-S-821-91-2021-12-DE erschienen.Berücksichtigt sind die Ergänzungen 2019/11 zu Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
KKS Pocketbook, Deutsch, 4. Auflage - PrintVGBE-S-811-91-2021-12-DE - VGB-B-105-007.4Das KKS-Pocketbook (KKS - Kraftwerk-Kennzeichensystem) für konventionelle, nukleare und erneuerbare Energieanlagen sowie Speicher und Power-2-X ist in 4. Auflage als Aktualisierung VGBE-S-811-91-2021-12-DE erschienen. Berücksichtigt sind di Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.