Back to Top
- Alternative Suchbegriffe
- electricity generation facts and figures 2012 2017
- electricity generation facts and figures 201 201
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 100
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 12
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - ebookVGB-S-506-00-2019-02-EN-ebookThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Rohre für Kondensatoren und andere Wärmeaustauscher - Kupferlegierungen - ebookR106ebookDie VGB-Richtlinien „Rohre für Kondensatoren und andere Wärmeaustauscher“ sind derzeit in drei Werkstoffgruppen (R 106 „Kupferlegierungen“, R 113 „Nichtrostende Stähle“ und R 114 „Titan“) Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part B "Stainless Steels") - ebookR113e-ebookThe "Tubes for condensers and other heat exchangers for the operation of steam turbine plants" guidelines are currently split into three material groups (VGB-R 106 "Copper Alloys", VGB-R 113 "Stainless Steels" and VGB-R 114 "Titanium"). The guideline Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Band 11: Sturm · Efficient Operations - Intelligent Diagnosis and Maitenance - PrintB011eIntelligent Diagnosis and Maitenance Mehr erfahren125,00 €133,75 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.