Back to Top
- Verwandte Suchbegriffe
- powertech guideline vgb b102
- powertech guideline vgb b105
- powertech guideline vgb b903
- powertech guideline vgb b102e
- powertech guideline vgb b106e
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - ebookVGB-S-609-00-2016-03-EN-ebookThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (2013, as per 2012-12) - ebookTW805e-13-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
An Engineer‘s Guide to Desalination (Joachim Gebel and Süleyman Yüce) - PrintB030An Engineer‘s Guide to Desalination Joachim Gebel, PhD, and Süleyman Yüce, PhD Within the next years keywords such as water scarcity, water pollution and water aid projects will become more and more familiar to the broad public as well as put int Mehr erfahren176,64 €189,00 € Inkl. MwSt.
-
KKS Identification System for Power Stations - Key Part: Function Keys, Equipment Unit Keys, Component Keys - Excel-table (English edition)KKS-Basis-EXCEL-ENKKS Identification System for Power Stations, VGB-Standard VGB-S-811-01-2018-01-EN. Excel-table of the Key Part (English edition, German edition available): Function Keys, Equipment Unit Keys, Component Keys Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants - Letter Codes for Basic Functions and Product Classes - ebookB102ebookDie Richtlinie VGB-B102 ist für die Kennzeichnung der Grundfunktionen und Produktklassen in Kraftwerken anzuwenden. *Zweisprachige Ausgabe: Deutsch und Englisch The guideline VGB-B102 has to be used for the designation of the basic functions, Mehr erfahren350,00 €374,50 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - PrintVGB-S-503-00-2017-06-ENOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - ebookVGB-S-503-00-2017-06-EN-ebookOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - PrintVGB-S-823-33-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - ebookVGB-S-823-33-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants - Letter Codes for Basic Functions and Product Classes - PrintB102Die Richtlinie VGB-B102 ist für die Kennzeichnung der Grundfunktionen und Produktklassen in Kraftwerken anzuwenden. Hinweis: Das vollständige RDS-PP® umfasst die Publikationen VGB-S-821-00 und VGB-B 102. *Zweisprachige Ausgabe: D Mehr erfahren350,00 €374,50 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.



















