Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (eBook)VGB-S-823-31-2014-12-EN-DE-eBookDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Dokumentationsbedarf für Anlagen der Strom- und Wärmeerzeugung / Provision of Technical Documentation for Energy Supply Units - Documentation requirements for plants for e - PrintVGBE-S-831-11-2025-04-DE-ENDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Dokumentationsbedarf für Anlagen der Strom- und Wärmeerzeugung / Provision of Technical Documentation for Energy Supply Units - Documentation requirements for plants for e - ebookVGBE-S-831-11-2025-04-DE-EN-ebookDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Änderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards kostenlos/free of charge - ebookvgbe-aenderung-fcÄnderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards (kostenlos/free of charge): VGB-B 108 (2014-11) | VGB-S-811 (2019-11 ed. 2022-12) | VGB-S-821 (2019-11 ed. 2022-12) VGB-S-823-31 (2018-10) | VGB-S-832 (2020-05, zur& Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Regeln zur Bildung von Benennungen und deren Anwendung in der Kraftwerkstechnik (Print)VGB-B108-d/eZweck der VGB-Richtlinie B 108 ist es, Planern, Errichtern und Betreibern von Kraftwerksanlagen die Möglichkeit zu geben, Anlagenteile, deren Funktionen, physikalische Größen und Zustände einheitlich sowie verfahrenstechnisch ver Mehr erfahren90,00 €96,30 € Inkl. MwSt.
-
Regeln zur Bildung von Benennungen und deren Anwendung in der Kraftwerkstechnik (eBook)VGB-B108d/e-ebookZweck der VGB-Richtlinie B 108 ist es, Planern, Errichtern und Betreibern von Kraftwerksanlagen die Möglichkeit zu geben, Anlagenteile, deren Funktionen, physikalische Größen und Zustände einheitlich sowie verfahrenstechnisch ver Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Dokumentenkennzeichen für Anlagen der Energieversorgung - Document Designation for Energy Supply Units 2nd Edition / 2. Ausgabe - PrintVGB-S-832-00-2021-05-DE-ENDer VGB-Standard VGB-S-832-00 beschreibt für Anlagen der Energieversorgung den Aufbau und die Bestandteile des Dokumentenkennzeichens. In Tabellen werden Objektschlüssel für übergeordnete Objekte (technisch oder administrativ) und Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
Dokumentenkennzeichen für Anlagen der Energieversorgung - Document Designation for Energy Supply Units 2nd Edition / 2. Ausgabe - ebookVGB-S-832-00-2021-05-DE-EN-ebookDer VGB-Standard VGB-S-832-00 beschreibt für Anlagen der Energieversorgung den Aufbau und die Bestandteile des Dokumentenkennzeichens. In Tabellen werden Objektschlüssel für übergeordnete Objekte (technisch oder administrativ) und Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.