Back to Top
- Alternative Suchbegriffe
- teil ii unterlagen for de festigkeitsberechnung
- teil ii unterlag for de festigkeitsberechnung
- Verwandte Suchbegriffe
- for anlagen de energieversorgung
- forschungsprojekt 2012 vgb tw 750
- forschungsprojekt 2013 vgb tw 750
- forschungsprojekt 202 vgb tw 770
- forschungsprojekt 202 vgb tw 790
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Feuerfestsysteme in Anlagen zur thermischen Abfallverwertung - PrintVGB-S-215-00-2012-11-DETechnische Weiterentwicklungen und Erkenntnisse auf dem Gebiet der Feuerfestsysteme wurden in dieser Ausgabe des VGB-Standards eingearbeitet. Der Zweck ist die Zusammenfassung von Informationen über die besonderen Erfahrungen auf dem Gebiet der Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Feuerfestsysteme in Anlagen zur thermischen Abfallverwertung - ebookVGB-S-215-00-2012-11-DE-ebookTechnische Weiterentwicklungen und Erkenntnisse auf dem Gebiet der Feuerfestsysteme wurden in dieser Ausgabe des VGB-Standards eingearbeitet. Der Zweck ist die Zusammenfassung von Informationen über die besonderen Erfahrungen auf dem Gebiet der Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Bestellung und Ausführung von Armaturen in Wärmekraftwerken - PrintVGB-S-107-00-2018-03-DEDer VGB-Standard VGB-S-107 "Bestellung und Ausführung von Armaturen in Wärmekraftwerken" soll zwischen Besteller und Lieferer eindeutige Festlegungen für den Liefer- und Leistungsumfang und für die anschließende Vertragsabwi Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
Bestellung und Ausführung von Armaturen in Wärmekraftwerken - ebookVGB-S-107-00-2018-03-DE-ebookDer VGB-Standard VGB-S-107 "Bestellung und Ausführung von Armaturen in Wärmekraftwerken" soll zwischen Besteller und Lieferer eindeutige Festlegungen für den Liefer- und Leistungsumfang und für die anschließende Vertragsabwi Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
Methodik für das Vorgehen bei Qualifizierung von zerstörungsfreien Prüfungen (VGB-ENIQ-Richtlinie) - ebookR516ebookDiese Richtlinie beinhaltet die allgemeine Vorgehensweise bei Qualifizierungen und legt die Schritte für die Qualifizierung (Eignungsnachweis) einer zerstörungsfreien Prüfung fest. Die Qualifizierung soll sicherstellen, dass die Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Reliability Indicators with KISSY - VGB Research Project 361 (only PDF-download) - PrintTW104VGB Power Plant Information System This report was created by the VGB European Working Group “Performance Indicators”, in order to support the VGB research project “Reliability Indicators with KISSY” lead by DNV KEMA in close Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Dehnungsrisskorrosion in fossil-befeuerten Kraftwerken - PrintVGBE-TW-532Der vorliegende technisch-wissenschaftliche Bericht VGBE-TW-532 stellt die Dehnungsrisskorrosion (DRK) in den Fokus. Dieser Mechanismus bildet den Übergangsbereich zwischen Spannungsrisskorrosion und Schwingungsrisskorrosion. Eine Abgrenzung ist wic Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
An Engineer‘s Guide to Desalination (Joachim Gebel and Süleyman Yüce) - PrintB030An Engineer‘s Guide to Desalination Joachim Gebel, PhD, and Süleyman Yüce, PhD Within the next years keywords such as water scarcity, water pollution and water aid projects will become more and more familiar to the broad public as well as put int Mehr erfahren176,64 €189,00 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.



















