Back to Top
- Alternative Suchbegriffe
- terms of utility industrie
- terms of utility industri
- Verwandte Suchbegriffe
- terms of utility industrie
- terms of utility
- terms of
- terms of utility industri
- industry guide 2014
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - ebookVGBE-S-010-00-2023-08-EN-ebookvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - PrintVGBE-S-010-00-2023-08-ENvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Cleaning Methods for the Bladings of Compressors and Turbines on Gas Turbines in the Open Process - ebookM106e-ebookMore often than not it is necessary to clean compressor bladings on gas turbines.When using fuels with strong impurities (e.g. crude oil, heavy fuel oil, coal gas)the turbine blading has also to be cleaned from time to time.For this reason the VGB sc Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - PrintVGB-S-811-01-2018-01-ENOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - ebookVGB-S-811-01-2018-01-EN-ebookOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - PrintVGB-S-823-33-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - ebookVGB-S-823-33-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.