Back to Top
- Verwandte Suchbegriffe
- feed water boiler water and steam quality vgb s042
- feed water boiler water and steam quality vgb s041
- feed water boiler water and steam quality vgb s040
- feed water boiler water and steam quality vgb s013
- feed water boiler water and steam quality vgb s041e
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken /// Material specification for components under pressure in fossil-fired power plants - PrintVGBE-S-109-00-2025-05-DE-ENThe present “Material specification for components under pressure in fossil-fired power plants” applies to the steam boiler assembly and piping systems of the water/steam circulation. It shall clearly determine the delivery contract and the subse Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken /// Material specification for components under pressure in fossil-fired power plants - ebookVGBE-S-109-00-2025-05-DE-EN-ebookDie hier vorliegende „Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken“ gilt für die Dampfkesselbaugruppe und Rohrleitungsanlagen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Design and operation of cooling towers - PrintVGBE-S-135-00-2024-05-ENThis new vgbe standard “Design and Operation of Cooling Towers” is intended to replace the old guidelines VGB-R 135e* “Planning of Cooling Towers” and VGB-R 129* “Recommendations for Winter Operation of Power Plant Wet Cooling Towers” (Ge Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Design and operation of cooling towers - ebookVGBE-S-135-00-2024-05-EN-ebookThis new vgbe standard “Design and Operation of Cooling Towers” is intended to replace the old guidelines VGB-R 135e* “Planning of Cooling Towers” and VGB-R 129* “Recommendations for Winter Operation of Power Plant Wet Cooling Towers” (Ge Mehr erfahren300,00 €321,00 € Inkl. MwSt.





