Back to Top
- Alternative Suchbegriffe
- kks and 86 978 and plat plant
- kks and 86 978 and plus plant
- Verwandte Suchbegriffe
- 978 3 86875 00 5
- 978 3 86875 07 5
- 978 3 96284 12 9
- 978 3 96284 268 0 print
- kks and 86 978 and plus pumps
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
KKS Pocketbook, English, 4th edition - PrintVGBE-S-811-91-2021-12-EN/VGB-B-105-007.4eThe 4th edition of the KKS Pocketbook (KKS - Kraftwerk-Kennzeichensystem/Identification System for Power Stations) for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-811-91-2021-09-EN.The 201 Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Allgemeiner Teil / Provision of Technical Documentation for Energy Supply Units - General Part - ebookVGBE-S-831-01-2025-04-DE-EN-ebookDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Allgemeiner Teil / Provision of Technical Documentation for Energy Supply Units - General Part - PrintVGBE-S-831-01-2025-04-DE-ENDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - ebookVGBE-S-010-00-2023-08-EN-ebookvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants - PrintVGBE-S-010-00-2023-08-ENvgbe energy e.V. hereby presents a revised version of the VGB-Standard VGB-S-010 for "Feed Water, Boiler Water and Steam Quality for Power Plants/Industrial Plants". This revised vgbe-Standard replaces the former edition 2011.This vgbe-Standard is av Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
KKS Identification System for Power Stations - Key Part: Function Keys, Equipment Unit Keys, Component Keys - Excel-table (English edition)KKS-Basis-EXCEL-ENKKS Identification System for Power Stations, VGB-Standard VGB-S-811-01-2018-01-EN. Excel-table of the Key Part (English edition, German edition available): Function Keys, Equipment Unit Keys, Component Keys Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.