Back to Top
- Verwandte Suchbegriffe
- 2023 12 en
- 2023 00
- 2023 heat 8
- 2023 hand 8
- 2023 08 de
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Betriebssicherheit in der Elektrotechnik - ebookVGB-S-163-00-2015-07-DE-ebookMit dem VGB-Standard VGB-S-163 wird für die elektrotechnischen Systeme und Komponenten des Kraftwerkes dargelegt, welche wesentlichen Vorschriften für die Beschaffenheit und den Betrieb gelten, und wie diese im Sinne der Umsetzung der BetrS Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Betriebssicherheit in der Elektrotechnik - PrintVGB-S-163-00-2015-07-DEMit dem VGB-Standard VGB-S-163 wird für die elektrotechnischen Systeme und Komponenten des Kraftwerkes dargelegt, welche wesentlichen Vorschriften für die Beschaffenheit und den Betrieb gelten, und wie diese im Sinne der Umsetzung der BetrS Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - PrintVGB-S-130-00-2017-07-DEVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - PrintVGB-S-823-33-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 33: Photovoltaische Kraftwerke; Application Guideline Part 33: Photovoltaic Power Plants - ebookVGB-S-823-33-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Photovoltaische Kraftwerke wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. T Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebookVGB-S-823-41-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.