Back to Top
- Alternative Suchbegriffe
- de en 62271 201 vdi 06 2014 27 08
- de en 62271 2015 vdi 06 201 27 08
- Verwandte Suchbegriffe
- vdi 006e 3 2010 03
- vdi 009e 3 2010 03
- vdi 009 3 2010 03
- vdi 03 3 2010 03
- vdi 004 3 2010 03
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Reinigung der Ölsysteme von Gas- und Dampfturbinenanlagen - ebookVGB-S-030-00-2013-06-DE-ebookDie Sammlung und Auswertung einer Vielzahl von Erfahrungen des Betriebes, der Installation, der Änderung und der Revision von Gas- und Dampfturbinenölanlagen, die in den vorliegenden VGB-Standard eingeflossen sind, sollen dazu beitragen, di Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Reinigung der Ölsysteme von Gas- und Dampfturbinenanlagen - PrintVGB-S-030-00-2013-06-DEDie Sammlung und Auswertung einer Vielzahl von Erfahrungen des Betriebes, der Installation, der Änderung und der Revision von Gas- und Dampfturbinenölanlagen, die in den vorliegenden VGB-Standard eingeflossen sind, sollen dazu beitragen, di Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - PrintVGB-S-024-00-2014-01-DEDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Umsetzung des Alterungsmanagements in der Bautechnik nach KTA 1403 - ebookVGB-S-024-00-2014-01-DE-ebookDie Regel KTA 1403 „Alterungsmanagement in Kernkraftwerken“ in der Fassung von November 2010 regelt grundlegend, wie die Betreiber ein Alterungsmanagement durchzuführen haben. Dieser VGB-Standard ermöglicht ein einheitliches Vor Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Druckentladung von Feststoffen aus Silo-Fahrzeugen - ebookVGB-S-049-00-2019-08-DE-ebookDieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Druckentladung von Feststoffen aus Silo-Fahrzeugen - PrintVGB-S-049-00-2019-08-DEDieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - Schlüsselteil: Funktionsschlüssel, Aggregateschlüssel, Betriebsmittelschlüssel - als Excel-Liste (Deutschsprachige Ausgabe)KKS-Basis-EXCEL-DEDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Betriebssicherheit in der Elektrotechnik - ebookVGB-S-163-00-2015-07-DE-ebookMit dem VGB-Standard VGB-S-163 wird für die elektrotechnischen Systeme und Komponenten des Kraftwerkes dargelegt, welche wesentlichen Vorschriften für die Beschaffenheit und den Betrieb gelten, und wie diese im Sinne der Umsetzung der BetrS Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Betriebssicherheit in der Elektrotechnik - PrintVGB-S-163-00-2015-07-DEMit dem VGB-Standard VGB-S-163 wird für die elektrotechnischen Systeme und Komponenten des Kraftwerkes dargelegt, welche wesentlichen Vorschriften für die Beschaffenheit und den Betrieb gelten, und wie diese im Sinne der Umsetzung der BetrS Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.