Back to Top
- Alternative Suchbegriffe
- de en 62271 2021 vdew 07 2015 2014 08
- de en 62271 2021 vdew 07 2014 2014 08
- Verwandte Suchbegriffe
- vdew 006 3 2012 03
- vdew 06 3 2010 03
- vdew 07 3 2003 03
- vdew 07 3 2012 03
- vdew 00 3 2015 03
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - PrintVGB-S-164-13-2021-03-DEDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Einphasig gekapselte Generatorableitung - ebookVGB-S-164-13-2021-03-DE-ebookDie in der VGB-Fachgruppe „Elektrische Maschinen und Anlagen“ vertretenen Betreiber veranlassten die Bildung einer Projektgruppe „Generatorableitung“, um konkrete Vorgaben für Auslegung, Errichtung, Modifizierung, Betrieb Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - PrintVGB-S-006-00-2012-09-DEDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - ebookVGB-S-006-00-2012-09-DE-ebookDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Kohlenstaubmessung mit der Nulldruck-Pendelsonde und/oder adaptierbaren Onlinemesstechniken - PrintVGB-S-150-29-2021-10-DEFeuerungseinstellungen tragen sowohl zur Wirkungsgradverbesserung von Dampferzeugern und somit zur CO2-Minderung als auch zur schadstoffarmen Verbrennung bei. Eine der Brennstoffqualität angepasste Ausmahlung und die gleichmäßige Bren Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - PrintVGBE-S-213-00-2024-04-DEBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - ebookVGBE-S-213-00-2024-04-DE-ebookBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Kohlenstaubmessung mit der Nulldruck-Pendelsonde und/oder adaptierbaren Onlinemesstechniken - ebookVGB-S-150-29-2021-10-DE-ebookFeuerungseinstellungen tragen sowohl zur Wirkungsgradverbesserung von Dampferzeugern und somit zur CO2-Minderung als auch zur schadstoffarmen Verbrennung bei. Eine der Brennstoffqualität angepasste Ausmahlung und die gleichmäßige Bren Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.



















