Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Preservation of Power Plants - PrintS-116-00-2016-04-ENThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Preservation of Power Plants - ebookVGB-S-116-00-2016-04-EN-ebookThe VGB-Standard VGB-S116 shall apply to plants for firing fossil fuels and plants for firing substitute fuels. This standard comprises all essential process systems which are to be considered during plant outage or shutdown and have to be preserved. Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.