Back to Top
- Verwandte Suchbegriffe
- Ordering Of Pipe Systems In Thermal Po
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- plants fur de mann kauf
- plants fur de mann kaufer
- plant fur de mann kaufer
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebookVGBE-S-891-00-2024-04-DE-EN-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren735,00 €786,45 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - PrintVGBE-S-891-00-2024-04-DE-ENZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren735,00 €786,45 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - ebookVGB-S-221-00-2014-06-EN-ebookVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - Print & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUSZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebook & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUS-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
Soft Rubber Linings in Flue Gas Desulphurization Test Procedures to Determine Suitability testing Criteria and Standard Values for the Assessment of Service Life - ebookM417e-ebookThis Instruction Sheet is subdivided into two sections. The first section describes the test procedures employed to determine the suitability of soft rubber linings in flue gas desulphurization plants while the second section deals with the testing c Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - ebookVGB-S-165-00-2014-07-EN-eBookThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.