Back to Top
- Alternative Suchbegriffe
- application explanations superord vgb b102 part a
- application explanations superord vgb b106 plant a
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2 englisch
- VGB/BAW-Standard "Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 3: Applikation von Beschichtungssy
- vgb r 10 anhang 3
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Einführung und Überblick der VGB-Standards für Abnahmetests und Kontrolluntersuchungen 2022, ebook, kostenlosVGBE-S-150-20-2022-03-DE-ebookDer vorliegende vgbe-standard vgbe-s-150-20 „Einführung und Überblick der vgbe/VGB-Standards für Abnahmetests und Kontrolluntersuchungen“ (Ausgabe 2022) wurde in Verantwortung der vgbe*-Fachgruppe „Abnahmetests und Ko Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebookVGB-S-002-03-2019-10-EN-ebookThis VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the use Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Design Standards for Instrumentation and Control Equipment (B0 to B6) - ebookR170(B0-B6)e-ebookSections B1 to B6, present as a collection of data in VGB guideline VGB R 170 B, are to be understood as a catalogue of requirements for the specification of and/or the terms of reference for instrumentation and control equipment projects. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Sammlung von VGB-Richtlinien und VGB-Empfehlungen für die Leittechnik - Band I.1, Teile C1.1 – C1.9: Meßtechnik - ebookR123-C-I.1-ebookDie Meßtechnik ist die Grundlage für die Überwachung, steuerung und Regelung des Prozesses und der Kraftwerksanlage. Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - PrintVGB-S-170-12-2018-08-ENThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - ebookVGB-S-034-00-2014-10-EN-ebookThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.