Back to Top
- Verwandte Suchbegriffe
- empfehlungen revision vgb r 11
- empfehlungen revision vgb r 100
- empfehlungen revision vgb r 10
- empfehlungen revision vgb r 12
- empfehlungen für de revision von dampfturbinen a
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guideline for Design and Purchase of Spring Elements for Machine Foundations - ebookR603e-ebookThis guideline applies to spring elements for foundations in accordance with: - DIN 4024-1 Machine foundations; flexible structures that support machines with rotating elements - DIN 4024-2 Machine foundations; rigid foundations for machinery Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Umgang mit wassergefährdenden Stoffen im Kraftwerk - ebookM305ebookGerade bei technischen Anlagen fehlen vielfach weitere Einzelangaben über das "Wie" bei der Durchführung der verschiedenen möglichen Maßnahmen. Diese Lücke füllen die allgemein anerkannten Regeln der Technik aus, die in Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Thermal Behaviour of Steam Turbines - ebookR105e-ebooklt should always be remembered that placing excessive requirements on the start-up and loading behaviour of turbines will reduce the serve life of certain components . Mention is also made of the gentle mode of operation nowadays possible when suitab Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Maßnahmen zur Verhütung von Ruß-, Flugkoks- und Rußflockenauswurf bei Ölfeuerungen - ebookM202ebookDie Erfahrungen, die bei der VGB iiber den Betrieb von Glfeuerungen vorliegen, zeigen, daß "Dunkler Rauch" und "Auswurf aller Arten von Ruß praktisch vermieden werden konnen, wenn ein einwandfreier Betrieb der Feuerungen sichergestellt wi Mehr erfahren30,00 €32,10 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Rahmenempfehlung - Errichtung und Inbetriebnahme fossilbefeuerter Kraftwerke (einschließlich überarbeiteter Baustellenordnung) - ebookR511ebookDie zunehmende Baustellengröße, die Bauzeiten über mehrere Jahre, die erforderliche Zusammenarbeit einer Vielzahl von Firmen und die Notwendigkeit, die vielseitigen Aufgaben der Bauleiter, Inbetriebnahme-Ingenieure und Sicherheitsfach Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Konzeption, Spezifizierung und Leistungsnachweis von Anlagen zur Wasserentsalzung - ebookM407ebookDieses Merkblatt beschreibt die Anforderungen an eine VE-Anlage zur Erzeugung von Deionat. Vollentsalzung im Sinne dieses Merkblattes ist die praktisch völlige Entfernung von Elektrolytenund gelöster Kieselsäure aus Rohwasser mit Hilfe Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Dosierung und Dosieranlagen für Wasser-Dampf-Kreisläufe - PrintVGB-S-042-00-2018-01-DEZiel des VGB-Standard VGB-S-042-00-2018-01-DE ist die Spezifizierung und Erörterung von Methoden und Systemen zur Konditionierung von Zusatzwasser, Kesselspeisewasser, Kesselwasser, Dampf und Kondensat für den Betrieb von Wasser-Dampf-Kreis Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Dosierung und Dosieranlagen für Wasser-Dampfkreisläufe - ebookVGB-S-042-00-2018-01-DE-ebookZiel des VGB-Standard VGB-S-042-00-2018-01-DE ist die Spezifizierung und Erörterung von Methoden und Systemen zur Konditionierung von Zusatzwasser, Kesselspeisewasser, Kesselwasser, Dampf und Kondensat für den Betrieb von Wasser-Dampf-Kreis Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Wasserentsalzung mit Ionenaustauschern - PrintVGB-S-405-00-2018-04-DEDer VGB-Standard VGB-S- 405 gehört zu einer Gruppe von inhaltlich zusammenhängenden Dokumenten zum Thema „Wasserentsalzung“ in energietechnischen Anlagen (bisher erschienen als Merkblätter VGB-M 404 G bis VGB-M 407 G). Mehr erfahren240,00 €256,80 € Inkl. MwSt.