Back to Top
- Alternative Suchbegriffe
- vgb r 10 lieferant de technischen dokumentation for kraftwerke
- vgb r 10 lieferung der technischen dokumentation for kraftwerke
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- vgb r 10 anhang 3
- vgb r 10 anlag 3
-
Rohrhalterungen - ebookR510ebookDiese Richtlinie dient der Erhöhung der Gebrauchstüchtigkeit (Anlagenverfügbarkeit) von Rohrhalterungen für Rohrleitungsanlagen und auch anderer Komponenten in Wärmekraftwerken. Mehr erfahren70,00 €74,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Empfehlung zur Qualifikation des einsatzlenkenden Personals in Kernkraftwerken - ebookM121ebookIm Kapitel Instandhaltungsordnung der Betriebshandbücher (BHB) der Kernkraftwerke ist auf der Basis der Richtlinie für das Verfahren zur Vorbereitung und Durchführung von Instandhaltungs- und Änderungsarbeiten in Kernkraftwerken d Mehr erfahren30,00 €32,10 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - PrintVGB-S-217-00-2012-11-ENWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
An Engineer‘s Guide to Desalination (Joachim Gebel and Süleyman Yüce) - PrintB030An Engineer‘s Guide to Desalination Joachim Gebel, PhD, and Süleyman Yüce, PhD Within the next years keywords such as water scarcity, water pollution and water aid projects will become more and more familiar to the broad public as well as put int Mehr erfahren176,64 €189,00 € Inkl. MwSt.
-
Dust concentration measurement in flue gases, avoiding theinfluence of sulphuric acid aerosols on the measured value to a large extent - ebookM301e-ebookResponding to growing demands of the European environmental legislation, power plant operators are increasingly focusing on the topic of dust emission measurement again. Several independent studies provide evidence that the generally applied methods Mehr erfahren100,00 €107,00 € Inkl. MwSt.