- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB/BAW-Standard "Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 3: Applikation von Beschichtungssy
- vgb r 11 anhang 3
- vgb r 12 anlag 3
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - PrintVGB-S-130-00-2017-07-DEVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Fire Protection in Power Plants - ebookR108e-ebookThe VGB-Guideline R108e aim to form a foundation that operators can use to compile their own fire protection strategies, tailored to suit the particular plant in question. For this reason, a number of suitable steps are given as examples. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.
-
Rahmenempfehlung - Errichtung und Inbetriebnahme fossilbefeuerter Kraftwerke (einschließlich überarbeiteter Baustellenordnung) - ebookR511ebookDie zunehmende Baustellengröße, die Bauzeiten über mehrere Jahre, die erforderliche Zusammenarbeit einer Vielzahl von Firmen und die Notwendigkeit, die vielseitigen Aufgaben der Bauleiter, Inbetriebnahme-Ingenieure und Sicherheitsfach Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - ebookVGB-S-221-00-2014-06-EN-ebookVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Herstellung und Errichtung sowie Bau- und Montageüberwachung von Rauchgasreinigungsanlagen - ebookR502ebookDie Richtlinie dient der Erhöhung der Verfügbarkeit und Sicherheit von Rauchgasreinigungsanlagen in Wärmekraftwerken. Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.