Back to Top
- Alternative Suchbegriffe
- inspection and evaluation of in service rotors
- Verwandte Suchbegriffe
- inspection and evaluation of in-service rotors
- Inspection and Evaluation of in-service Rotors and Casings
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 12
-
Availability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ve-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about availability and u Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - PrintVGBE-TW-531eThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
9 % to 12 % Cr Steels - Design, Manufacture, Fabrication and Safety Concepts - ebookVGBE-TW-531e-ebookThe aim of this report is to summarize the current state of knowledge in Germany on the quality-compliant production, processing, and design of the now established 9 % to 12 % Cr steel grades used in the energy and process industry and their applicat Mehr erfahren360,00 €385,20 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebookVGB-S-002-03-2019-10-EN-ebookThis VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the use Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - ebookVGB-S-513-00-2014-07-EN-ebookThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Fast Cooling-down of Steam Turbines - ebookM110e-ebookThe outage time necessary for inspections and repair of faults and damages can be substantially reduced by rapid cooling of steam turbines. This Instruction Sheet describes various processes for cooling down steam turbines. The information contained Mehr erfahren30,00 €32,10 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.