Back to Top
- Alternative Suchbegriffe
- ausfuhrungsrichtlini fur motoren und drehzahlgeregelt antriebssysteme ebook
- ausfuhrungsrichtlinie fur motoren und drehzahlgeregelt antriebssysteme ebook
- Verwandte Suchbegriffe
- ebook download vgb s 517
- ebook download vgb s 516
- ebook download vgb s 504
- ebook download vgb s 540
- ebook downloaded vgb s 503
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Construction, Operation and Maintenance of Flue Gas Denitrification Systems (DeNOx) - ebookVGB-S-014-2011-EN-ebookAfter facilities for reduction of dust emissions were deemed to be state-of-the-art worldwide, beginning in 1970, tests were performed in Germany for the reduction of emissions of SO2 and x. The first measures for the use of combustion technology to Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Betriebssicherheit in der Elektrotechnik - PrintVGB-S-163-00-2015-07-DEMit dem VGB-Standard VGB-S-163 wird für die elektrotechnischen Systeme und Komponenten des Kraftwerkes dargelegt, welche wesentlichen Vorschriften für die Beschaffenheit und den Betrieb gelten, und wie diese im Sinne der Umsetzung der BetrS Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guideline for Design and Purchase of Spring Elements for Machine Foundations - ebookR603e-ebookThis guideline applies to spring elements for foundations in accordance with: - DIN 4024-1 Machine foundations; flexible structures that support machines with rotating elements - DIN 4024-2 Machine foundations; rigid foundations for machinery Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebookVGB-S-036-00-2017-04-EN-ebookThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Quality Assurance in the Manufacture of Generators - ebookVGB-S-166-00-2014-02-EN-ebookThis VGB-Standard is intended to assist purchasers and operators of generators to assure the quality of the generator and its auxiliary systems and components during the manufacturing phase. It sets out the VGB requirements for quality. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Chimneys for Operation without Flue Gas Reheating after FGD - ebookM643e-ebookThe enactment of the amended version of the 13th Ordinance for the Implementation of the Federal Immission Control Act (13. BImSchV; Ordinance on Large Combustion and Gas Turbine Plants, [1]) in July 2004 effectively aligned the German ambient pollut Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Industrieschornsteine, Beurteilung der Bauarten, Hinweise zur Bauausführung und Inbetriebnahme - ebookM642ebookDas VGB-Merkblatt "Schornsteine - Beurteilung der Bauarten, Hinweise zur Bauausführung und zur Inbetriebnahme", erste Ausgabe 1990, hatte als verfahrens- und ausführungstechnische Orientierungshilfe Betreibern, Planern und Lieferanten vielf Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Band 06: Dampf- und Gasturbinen, Teil 1B006Das vorliegende Buch soll eine wertvolle Unterlage für die Ausbildung und Schulung von Kraftwerkspersonal sein, sowohl für Kraftwerksmeister und Kraftwerker als auch in gewissem Umfang für Kraftwerksingenieure und Studierende der Fachr Mehr erfahren102,00 €109,14 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - PrintVGB-S-131-00-2017-07-DEDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - ebookVGB-S-164-11-2016-08-EN-ebookTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Invitation to Tender Criteria for Heat Recovery Steam Generators Downstream of Gas Turbines - ebookM222e-ebookUpon the initiative of the VGB Committee “Steam Generators“ a special working group was founded to establish criteria for invitations to tender of heat recovery steam generators downstream of gas turbines. *Dieses Produkt ist ebenfalls i Mehr erfahren200,00 €214,00 € Inkl. MwSt.