Back to Top
- Alternative Suchbegriffe
- de en 62271 201 vdew 06 2016 2024 08
- de en 62271 2015 vdew 06 201 2024 08
- Verwandte Suchbegriffe
- vdew 04 3 2010 03
- vdew 002 3 2012 03
- vdew 00 3 272 03
- vdew 00 3 22 03
- vdew 007 3 2012 03
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - ebookVGB-S-210-00-2015-07-EN-ebookThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Druckentladung von Feststoffen aus Silo-Fahrzeugen - ebookVGB-S-049-00-2019-08-DE-ebookDieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Druckentladung von Feststoffen aus Silo-Fahrzeugen - PrintVGB-S-049-00-2019-08-DEDieser VGB-Standard dient dazu, die möglichen Gefahren beim Entladen aufzuzeigen und entsprechende Schutzmaßnahmen zu beschreiben. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Vermeidung von Generatorschäden in Folge von Betauung spannungsführender Teile - PrintVGB-S-164-12-2016-10-DEDer VGB-Standard VGB-S-164-12 dient als Leitfaden zur Reduktion der Gefahr von Generatorschäden als Folge von Betauung spannungsführender Teile. Sie gilt insbesondere für wasserstoffgekühlte Generatoren mit zusätzlich direkt Mehr erfahren90,00 €96,30 € Inkl. MwSt.
-
Vermeidung von Generatorschäden in Folge von Betauung spannungsführender Teile - ebookVGB-S-164-12-2016-10-DE-ebookDer VGB-Standard VGB-S-164-12 dient als Leitfaden zur Reduktion der Gefahr von Generatorschäden als Folge von Betauung spannungsführender Teile. Sie gilt insbesondere für wasserstoffgekühlte Generatoren mit zusätzlich direkt Mehr erfahren90,00 €96,30 € Inkl. MwSt.
-
Angabe und Verarbeitung von Einwirkungen auf Bauwerke in Kraftwerksanlagen - PrintVGB-S-602-00-2016-04-DEDer vorliegende VGB-Standard dient dem Ziel, ein vereinheitlichtes Verfahren zur Definition, Klassifizierung und Verarbeitung von Einwirkungen an Tragwerke bei der Errichtung von Kraftwerken anzugeben. Dabei sollen auch signifikante Einflüsse vo Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Angabe und Verarbeitung von Einwirkungen auf Bauwerke in Kraftwerksanlagen - ebookVGB-S-602-00-2016-04-DE-ebookDer vorliegende VGB-Standard dient dem Ziel, ein vereinheitlichtes Verfahren zur Definition, Klassifizierung und Verarbeitung von Einwirkungen an Tragwerke bei der Errichtung von Kraftwerken anzugeben. Dabei sollen auch signifikante Einflüsse vo Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - ebookVGBE-TW-532e-ebookThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Dehnungsrisskorrosion in fossil-befeuerten Kraftwerken - PrintVGBE-TW-532Der vorliegende technisch-wissenschaftliche Bericht VGBE-TW-532 stellt die Dehnungsrisskorrosion (DRK) in den Fokus. Dieser Mechanismus bildet den Übergangsbereich zwischen Spannungsrisskorrosion und Schwingungsrisskorrosion. Eine Abgrenzung ist wic Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Strain induced corrosion cracking in fossil-fired power plants - PrintVGBE-TW-532eThis technical-scientific report focuses on strain induced corrosion cracking (SICC). This mechanism forms the transitional area between stress corrosion cracking and corrosion fatigue cracking. A distinction is important to be able to define effecti Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Analyse der Nichtverfügbarkeit von Kraftwerken 2013 – 2022, Ausgabe 2023 (KISSY Datenbank-Auswertung) - ebookVGBE-TW-103A-2023-ebookMit dem Ziel, den Betrieb von Kraftwerksanlagen und die Anlagen selbst zu bewerten, zu vergleichen und zu optimieren, sammelt VGB seit 1970 nach einheitlichen Definitionen und Ermittlungsverfahren Daten über die Verfügbarkeit und Ausnutzung von Kra Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.