Back to Top
- Alternative Suchbegriffe
- assessment of fatigue loaded components in hydro power plant
- assessment of fatigue loads components in hydro power plants
- Verwandte Suchbegriffe
- powertech guideline vgb b003
- powertech guideline vgb b105
- plants fur de mann kauf
- plants fur de mann kaufer
- plants fur de matt kaufer
-
Recommendation for the Introduction of Risk Based Maintenance - ebookM131e-ebookThe aim of the liberation of the European energy market was and is the competition of the operating companies at the market, of which more efficiency and noticeably low prices for the customers should be achieved. Due to this transition, from a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Structural Design of Cooling Towers - ebookVGB-S-610-00-2019-10-EN-ebookThis VGB-Standard VGB-S-610, “Structural Design of Cooling Towers” constitutes the joint basis – together with VGB-R 135e and VGB-R 612e – for the civil engineering-related planning including design, construction and approval Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
KKS-Application Explanations - ebookB106e-ebookThe Application Explanations show the many possible ways of using KKS to fulfil the various identification requirements of the engineering disciplines. The application explanations are also structured in keeping with these requirements. Remark: The Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation für Anlagen der Energieversorgung - Allgemeiner Teil / Provision of Technical Documentation for Energy Supply Units - General Part - ebookVGBE-S-831-01-2025-04-DE-EN-ebookDer VGBE-S-831 (mehrteilig) hat die Aufgabe einen Rahmen festzulegen für: Dokumentationsinhalte, Dokumentationsstruktur und -form, Kennzeichnung von Dokumenten, Zuordnung von Dokumenten zu Referenzkennzeichen (KKS, RDS-PP), Lieferfristen, Übergabe- Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (eBook)VGB-S-823-31-2014-12-EN-DE-eBookDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Design Standards for Instrumentation and Control Equipment (B0 to B6) - ebookR170(B0-B6)e-ebookSections B1 to B6, present as a collection of data in VGB guideline VGB R 170 B, are to be understood as a catalogue of requirements for the specification of and/or the terms of reference for instrumentation and control equipment projects. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Guideline for the Use of High-Temperature Bolting - ebookR505e-ebookThis new edition describes the collected manufacturing and operating experience gained, the results of the latest materials examinations as well as the tests and inspections to be performed upon operational loading. This new edition is also supported Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Verfügbarkeit von Kraftwerken 2012 - 2021, Ausgabe 2022 (KISSY Datenbank-Auswertung) - ebookVGB-TW-103V-2022-ebookMit dem Ziel, den Betrieb von Kraftwerksanlagen und die Anlagen selbst zu bewerten, zu vergleichen und zu optimieren, sammelt VGB seit 1970 nach einheitlichen Definitionen und Ermittlungsverfahren Daten über die Verfügbarkeit und Ausnutzung Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.