- Überwachungskonzept für ölgekühlte Transformatoren in Kernkraftwerken
- überwachungskonzept for ölgekühlte transformatoren in kernkraftwerken
- beim berat en line
- beim barato en lines
- beim berat en lines
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Guideline for the Use of High-Temperature Bolting - ebookR505e-ebookThis new edition describes the collected manufacturing and operating experience gained, the results of the latest materials examinations as well as the tests and inspections to be performed upon operational loading. This new edition is also supported Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - PrintVGB-S-503-00-2017-06-ENOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - ebookVGB-S-503-00-2017-06-EN-ebookOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Technical and Commercial Key Indicators for Power Plants - 9th edition 2019, free of charge - ebookVGB-S-002-03-2019-10-EN-ebookThis VGB-Standard allows the user to make a technical and economic assessment of power plants. In addition, the effect of price effects and the legal requirements on the power plant operation can be analyzed using the VGB-Standard. In detail, the use Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Fire Protection in Power Plants - ebookR108e-ebookThe VGB-Guideline R108e aim to form a foundation that operators can use to compile their own fire protection strategies, tailored to suit the particular plant in question. For this reason, a number of suitable steps are given as examples. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Turbine internal drains - PrintVGB-S-016-00-2014-08-ENThe VGB-Standard VGB-S-016-00-2014-08-EN is to give an overview of how the drains system should be designed for all types and sizes of steam turbines. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebookVGB-S-823-41-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Quality Requirements for District Heating Water - ebookM410e-ebookAs a result of the increasing importance of district heating in the context of energy supply, the VGB Expert Committee "Water Chemistry in Thermal Power Plants" has produced a revised edition of the Instruction Sheet "Quality Requirements for Distric Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Characterisation of Power Plant Coal - PrintVGB-S-210-00-2015-07-ENThe precursor of this Standard the VGB-Bulletin “Charakterisierung von Kraftwerkskohlen” (VGB-R 210; Characterisation of Power Plant Coals) appeared 12 years ago (2003). Some new developments, but, in particular, changed operating conditi Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.