Back to Top
- Alternative Suchbegriffe
- de en 62271 2017 vdew 02 214 2022 08
- de en 62271 2024 vdew 02 2014 2022 08
- Verwandte Suchbegriffe
- vdew 06 3 2010 03
- vdew 07 3 203 03
- vdew 07 3 2013 03
- vdew 00 3 2015 03
- vdew 04 3 2014 03
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - PrintVGB-S-006-00-2012-09-ENThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) The Guideline applies to the entire technical documentation (technical plant data and docume Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Vermeidung von Fremdkörpereintrag in geöffnete Systeme/Komponenten von Kernkraftwerken - ebookVGB-S-120-00-2016-02-DE-ebookIn dem VGB-Standard werden Maßnahmen aufgeführt, die für die Erhaltung der Sauberkeit in der Anlage (im mechanischen, elektrischen wie im chemischen Sinne) bei Instandhaltungs- und Änderungsarbeiten förderlich sind. Mehr erfahren130,00 €139,10 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - PrintVGB-S-006-00-2012-09-DEDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - ebookVGB-S-006-00-2012-09-DE-ebookDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Brennstoffmahlanlagen - PrintVGBE-S-213-00-2024-04-DEBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - ebookVGBE-S-213-00-2024-04-DE-ebookBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Prozessgüte in der Energietechnik - PrintVGB-S-012-00-2016-02-DEBeim Neubau von Kraftwerken und bei der Revision der Prozessleittechnik bestehender Anlagen gehört die Implementierung von Spezialwerkzeugen zur prozesstechnischen Optimierung zunehmend zum Lieferumfang des Leittechnik-Ausrüsters. Obwohl di Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Prozessgüte in der Energietechnik - ebookVGB-S-012-00-2016-02-DE-ebookBeim Neubau von Kraftwerken und bei der Revision der Prozessleittechnik bestehender Anlagen gehört die Implementierung von Spezialwerkzeugen zur prozesstechnischen Optimierung zunehmend zum Lieferumfang des Leittechnik-Ausrüsters. Obwohl di Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - PrintVGB-S-131-00-2017-07-DEDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.



















