Back to Top
- Alternative Suchbegriffe
- de en 62271 2012 vdew 07 2023 2024 08
- de en 62271 2012 vdew 07 2023 2012 08
- Verwandte Suchbegriffe
- vdew 006e 3 2010 03
- vdew 006 3 2010 03
- vdew 09 3 2010 03
- vdew 00 3 2010 03
- vdew 004 3 2010 03
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Brennstoffmahlanlagen - PrintVGBE-S-213-00-2024-04-DEBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Brennstoffmahlanlagen - ebookVGBE-S-213-00-2024-04-DE-ebookBesondere Beachtung bei der Planung einer Kesselanlage verdient die Brennstoffmahlanlage. Sie ist für die Betriebssicherheit entscheidend und bedarf sorgfältiger Wartung und laufender Instandhaltung. Der Standard VGBE-S-213-00-2024-04-DE ist eine A Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen. Teil 1: Rauchgasentschwefelung - ebookVGBE-S-150-26-2022-03-DE-ebookDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen Teil 2: Anlagen zur Stickoxidminderung - ebookVGBE-S-150-27-2022-03-DE-ebookDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen. Teil 1: Rauchgasentschwefelung - PrintVGBE-S-150-26-2022-03-DEDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen Teil 2: Anlagen zur Stickoxidminderung - PrintVGBE-S-150-27-2022-03-DEDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.