Back to Top
- Verwandte Suchbegriffe
- forschungsprojekt 2010 vgb tw 750
- forschungsprojekt 2012 vgb tw 700
- forschungsprojekt 2024 vgb tw 700
- forschungsprojekt 2024 vgb tw 750
- DESIGNATION CODES FOR DOCUMENT KIND CLASSIFICATION CODES IN POWER PLANTS
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
KKS Identification System for Power Stations - Key Part: Function Keys, Equipment Unit Keys, Component Keys - Excel-table (English edition)KKS-Basis-EXCEL-ENKKS Identification System for Power Stations, VGB-Standard VGB-S-811-01-2018-01-EN. Excel-table of the Key Part (English edition, German edition available): Function Keys, Equipment Unit Keys, Component Keys Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
IT Security for Generating Plants - PrintVGB-S-175-00-2014-04-ENThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
IT Security for Generating Plants - ebookVGB-S-175-00-2014-04-EN-ebookThe present VGB Standard S-175 explains fundamental concepts and compiles the threats and the security requirements derived from them in a structured and clear manner. In addition, recommendations for actions regarding the individual requirements hav Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Chimneys for Operation without Flue Gas Reheating after FGD - ebookM643e-ebookThe enactment of the amended version of the 13th Ordinance for the Implementation of the Federal Immission Control Act (13. BImSchV; Ordinance on Large Combustion and Gas Turbine Plants, [1]) in July 2004 effectively aligned the German ambient pollut Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - PrintVGB-S-503-00-2017-06-ENOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
VGB-Standard for the Internal Pipework of Turbine Systems - ebookVGB-S-503-00-2017-06-EN-ebookOver a lengthier period experience was gained with VGB-Guideline VGB-R 503e which is now taken into account in this edition of VGB-Standard VGB-S-503-00- 2017-06-EN. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - PrintVGB-S-164-11-2016-08-ENTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Recommendations for thermal/mechanical generator protection - ebookVGB-S-164-11-2016-08-EN-ebookTo detect incipient damage to generators in power plants, protective equipment is installed. For electrical protection, in 2012 VGB published recommendations in the VGB-Standard VGB-S-025 “Electrical Generating Unit Protection”. The VGBSt Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.