Back to Top
- Alternative Suchbegriffe
- standard vgb r 11 c 221
- standard vgb r 11 c 2.2
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- vgb r 10 anhang 3
- vgb r 10 anlag 3
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Besonderheiten des Brandschutzes in Abfallverbrennungsanlagen - ebookVGB-S-217-00-2012-11-DE-ebookMit diesem VGB-Standard sollen Möglichkeiten aufgezeigt werden, Brandgefahren mit konstruktiven Mitteln möglichst niedrig zu halten und ihnen durch angepasste Verfahrensweisen zu begegnen, bereits ausgebrochene Brände möglichst schnell zu erkenne Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Besonderheiten des Brandschutzes in Abfallverbrennungsanlagen - PrintVGB-S-217-00-2012-11-DEMit diesem VGB-Standard sollen Möglichkeiten aufgezeigt werden, Brandgefahren mit konstruktiven Mitteln möglichst niedrig zu halten und ihnen durch angepasste Verfahrensweisen zu begegnen, bereits ausgebrochene Brände möglichst schnell zu erkenne Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Prüfung von großen Schmiede- und Gussstücken für Dampf- und Gasturbosätze - PrintVGB-S-504-00-2015-12-DEDer sichere Betrieb und eine gute Verfügbarkeit von Turbinenanlagen stellen hohe Anforderungen an die Zuverlässigkeit und damit an die Qualität der eingesetzten Komponenten. Die Sammlung und Auswertung von Erfahrungen bei der Herstellu Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Prüfung von großen Schmiede- und Gussstücken für Dampf- und Gasturbosätze - ebookVGB-S-504-00-2015-12-DE-ebookDer sichere Betrieb und eine gute Verfügbarkeit von Turbinenanlagen stellen hohe Anforderungen an die Zuverlässigkeit und damit an die Qualität der eingesetzten Komponenten. Die Sammlung und Auswertung von Erfahrungen bei der Herstellu Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - PrintVGB-S-217-00-2012-11-ENWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - Print & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUSZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebookVGBE-S-891-00-2024-04-DE-EN-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren735,00 €786,45 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - PrintVGBE-S-891-00-2024-04-DE-ENZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren735,00 €786,45 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebook & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUS-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.