Back to Top
- Verwandte Suchbegriffe
- for the Water in Nuclear Power Plants with Light Water Reactors - VGB-R 401 J e - Published by VGB TECHNISCHE VEREINIGUNG J -DER
- forschungsprojekt 2010 vgb tw 750
- forschungsprojekt 2012 vgb tw 700
- forschungsprojekt 2024 vgb tw 700
- forschungsprojekt 2012 vgb tw 790
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Technische und kommerzielle Kennzahlen für Kraftwerksanlagen - 9. Ausgabe 2019, kostenlos - ebookVGB-S-002-03-2019-10-DE-ebookDer VGB-Standard ermöglicht dem Anwender eine technische und wirtschaftliche Beurteilung von Kraftwerksanlagen. Zudem kann mithilfe des VGB-Standards die Wirkung von Preiseffekten und den gesetzlichen Vorgaben auf den Kraftwerksbetrieb analysier Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - PrintVGB-S-217-00-2012-11-ENWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Particularities of Fire Protection of Waste to Energy Plants - ebookVGB-S-217-00-2012-11-EN-ebookWith this VGB-Standard options are demonstrated to reduce fire hazards by constructional means and to respond to them by appropriate procedures, to detect a fire that has already started as soon as possible, and to fight the fire effectively taking i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung - ebookVGB-S-831-00-2015-05-DE-ebookErsetzt durch mehrteilige Serie VGBE-S-831; weiterhin lieferbar für Bestandspflege. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) Der VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anlagendaten, Dokument Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Lieferung der Technischen Dokumentation (Technische Anlagendaten, Dokumente) für Anlagen der Energieversorgung - PrintVGB-S-831-00-2015-05-DEErsetzt durch mehrteilige Serie VGBE-S-831; weiterhin lieferbar für Bestandspflege. (https://shop.vgbe.energy/vgbe-s-831-01-2025-04-de-en-ebook.html) Der VGB-Standard gilt für die gesamte Technische Dokumentation (Technische Anlagendaten, Dokument Mehr erfahren630,00 €674,10 € Inkl. MwSt.