Back to Top
- Alternative Suchbegriffe
- for de planung von kuhlturmen
- Verwandte Suchbegriffe
- formelsammlung for de kraftwerksmeister
- die ebook bauteil e 01 und e 71
- die ebook bauteile e 01 und e 71
- for anlagen de energieversorgung
- for de betriebsgerechte funktionsbezogene dokumentation
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - PrintVGB-S-009-S-00;2012-03.ENData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Application of data reconciliation in accordance with VDI 2048 - ebookVGB-S-009-S-00;2012-03.EN-ebookData reconciliation is frequently discussed in connection with IT systems for optimization of technical processes in industry. Data reconciliation as set out in VDI 2048 is indeed an interesting and technically complex process with which the quality Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Assessment of fatigue loaded components in hydro power plants - PrintVGB-S-034-00-2014-10-ENThe VGB-Standard VGB-S-034-00-2014-10-EN deals with mechanical components and steel hydraulic structures for hydro power plants. The VGB-Standard deals solely with the impact of mechanical and/or thermal loads on the fatigue life of the plant pa Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
VGB-Standard für Überwachungs-, Begrenzungs- und Schutzeinrichtungen von Gasturbinen - PrintVGB-S-121-00-2016-04-DEDer sichere Betrieb von Gasturbinenanlagen stellt hohe Anforderungen an die Überwachungs-, Begrenzungs- und Schutzeinrichtungen. Ziel der Überarbeitung des VGB-Standrads war es, den Stand der Technik sowie aktuelle Regelwerke und Normen der Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
VGB-Standard für Überwachungs-, Begrenzungs- und Schutzeinrichtungen von Gasturbinen - ebookVGB-S-121-00-2016-04-DE-ebookDer sichere Betrieb von Gasturbinenanlagen stellt hohe Anforderungen an die Überwachungs-, Begrenzungs- und Schutzeinrichtungen. Ziel der Überarbeitung des VGB-Standrads war es, den Stand der Technik sowie aktuelle Regelwerke und Normen der Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Leitfaden für Abnahmeversuche an Wasser-Elektrolyseanlagen - PrintVGBE-S-159-00-2024-07-DEUm das volle Potenzial der Wasser-Elektrolyse zu entfalten, ist es entscheidend, dass die Anlagen zuverlässig und effizient arbeiten. Dazu bedarf es einer einheitlichen und verbindlichen Basis für Leistungsnachweise von Wasser-Elektrolysean Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Leitfaden für Abnahmeversuche an Wasser-Elektrolyseanlagen - ebookVGBE-S-159-00-2024-07-DE-ebookUm das volle Potenzial der Wasser-Elektrolyse zu entfalten, ist es entscheidend, dass die Anlagen zuverlässig und effizient arbeiten. Dazu bedarf es einer einheitlichen und verbindlichen Basis für Leistungsnachweise von Wasser-Elektrolysean Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Kühlwassersysteme und Kühlwasserbehandlung - PrintVGBE-S-455-00-2022-12-DEDer vorliegende vgbe-Standard „Kühlwassersysteme und Kühlwasserbehandlung“, VGBE-S-455-00-2022-12-DE, ersetzt die bisherige VGB-Kühlwasserrichtlinie VGB-R 455, die in der zweiten Ausgabe im Januar 2000 erschienen war. Dies Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Kühlwassersysteme und Kühlwasserbehandlung - ebookVGBE-S-455-00-2022-12-DE-ebookDer vorliegende vgbe-Standard „Kühlwassersysteme und Kühlwasserbehandlung“, VGBE-S-455-00-2022-12-DE, ersetzt die bisherige VGB-Kühlwasserrichtlinie VGB-R 455, die in der zweiten Ausgabe im Januar 2000 erschienen war. Dies Mehr erfahren300,00 €321,00 € Inkl. MwSt.