Back to Top
- Alternative Suchbegriffe
- de en 62271 2016 vdi 04 2014 2017 08
- de en 62271 2014 vdi 04 2014 2017 08
- Verwandte Suchbegriffe
- vdi 006e 3 2010 03
- vdi 009e 3 2010 03
- vdi 006 3 2010 03
- vdi 009 3 2010 03
- vdi 004 3 2010 03
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - PrintVGB-S-020-00-2017-12-ENThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Determination of Measurement Uncertainty upon Acceptance and Control Measurements - ebookVGB-S-020-00-2017-12-EN-ebookThe determination of measurement uncertainty always plays an important role in methods derived from mathematical statistics are described in detail in relevant tandards and guidelines as well as in technical literature. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - PrintVGB-S-131-00-2017-07-DEDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - ebookVGB-S-131-00-2017-07-DE-ebookDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - PrintVGB-S-006-00-2012-09-DEDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - ebookVGB-S-006-00-2012-09-DE-ebookDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Bautechnik bei Kernkraftwerken - ebookVGB-S-026-00-2012-08-DE-ebookDieser VGB-Standard soll Planern, Erstellern/Lieferanten, Betreibern, Behörden und weiteren interessierten Kreisen eine Unterlage (basierend auf deutschen atomrechtlichen Grundsätzen) bieten, in der die besonderen bautechnischen Anforderung Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen. Teil 1: Rauchgasentschwefelung - ebookVGBE-S-150-26-2022-03-DE-ebookDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen Teil 2: Anlagen zur Stickoxidminderung - ebookVGBE-S-150-27-2022-03-DE-ebookDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen. Teil 1: Rauchgasentschwefelung - PrintVGBE-S-150-26-2022-03-DEDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Abnahme- und Kontrolluntersuchungen an Rauchgasreinigungsanlagen Teil 2: Anlagen zur Stickoxidminderung - PrintVGBE-S-150-27-2022-03-DEDie Komplexität und die große Bedeutung der Rauchgasreinigungsanlagen für den sicheren, wirtschaftlichen und umweltverträglichen Betrieb der Kraftwerke erfordern auch in der Mess- und Versuchstechnik eine Anpassung an die besonde Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.