Back to Top
- Alternative Suchbegriffe
- 100 2025 nvopzp and 1 1 or is
- 173 2025 nvopzp and 1 1 or is
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 16
-
Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Recommendations for managing functional safety in steam boiler plants and systems of the water/steam cycle - 2nd revised edition (2020) - ebookVGB-S-008-00-2020-11-EN-ebookThe VGB standard addresses operators of thermal power plants as well as manufacturers and is intended to provide assistance in the application of the standards on functional safety. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Leitfaden für die Qualitätssicherung bei der Montage von Flanschverbindungen - PrintVGB-S-052-00-2020-06-DEIm Geltungsbereich der Betriebssicherheitsverordnungen werden in TRBS 2141 [1] die für die Sicherheit von lösbaren Verbindungen bei druckbeaufschlagten Arbeitsmitteln relevanten Einflussfaktoren genannt. Während für die Auslegung Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Part A: In-service monitoring of turbine oils in steam and gas turbines / Part B: In-service monitoring of fire-resistant fluids for steam and gas turbines - PrintVGB-S-416-00-2014-08-ENPart A describes effective in-service monitoring of oils in turbines. Due to thermal, chemical, physical and mechanical impacts, turbine oils are subject to change during operation. These changes normally lead to a deterioration in the oil characteri Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
VGB-Standard für das Wasser in Kernkraftwerken mit Leichtwasserreaktoren - Teil 1: DWR-Anlagen. Teil 2: SWR-Anlagen. - PrintVGB-S-401-00-2020-05-DEDer vorliegende VGB-Standard gibt den derzeitigen Stand von Wissenschaft und Technik hinsichtlich der wasserchemischen Spezifikationen wieder, die einen sicheren Anlagenbetrieb ermöglichen. Ihr liegt das Bestreben zugrunde, den Eintrag von Verun Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard für das Wasser in Kernkraftwerken mit Leichtwasserreaktoren - Teil 1: DWR-Anlagen. Teil 2: SWR-Anlagen. - ebookVGB-S-401-00-2020-05-DE-ebookDer vorliegende VGB-Standard gibt den derzeitigen Stand von Wissenschaft und Technik hinsichtlich der wasserchemischen Spezifikationen wieder, die einen sicheren Anlagenbetrieb ermöglichen. Ihr liegt das Bestreben zugrunde, den Eintrag von Verun Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - PrintVGB-S-031-00-2012-08-ENWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Operation of steam boiler installations Demands on the operator for the operation of steam boiler installations of categories III (from 1,000 bar/liter) and IV - ebookVGB-S-031-00-2012-08-EN-ebookWhen the German Ordinance on Industrial Safety and Health (BetrSichV) of 27 September 2002 came into effect, it marked a paradigm change in the technical rules for the operation of installations subject to monitoring. A hazard-related set of rules en Mehr erfahren260,00 €278,20 € Inkl. MwSt.
-
Leitfaden für die Qualitätssicherung bei der Montage von Flanschverbindungen - ebookVGB-S-052-00-2020-06-DE-ebookIm Geltungsbereich der Betriebssicherheitsverordnungen werden in TRBS 2141 [1] die für die Sicherheit von lösbaren Verbindungen bei druckbeaufschlagten Arbeitsmitteln relevanten Einflussfaktoren genannt. Während für die Auslegung Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Termes fondamentaux du secteur de l'électricité - 10e édition 2015, gratuit, free of charge - ebookVGB-S-002-01-2015-10-FR-ebookAvec la libéralisation du marché de l’électricité et la transition qui en découle vers une production d’électricité axée sur le marché, de plus en plus de nouveaux termes font Mehr erfahren0,00 €0,00 € Inkl. MwSt.Nicht lieferbar
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.