Back to Top
- Alternative Suchbegriffe
- ausvorgaben de vgb merkblattes fur kohlebunker
- ausvorgaben de vgb merkblattes for kohlebunker
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2:
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants %E2%80%93 2011 978-3-86875-544-2
- VGB/BAW-Standard "Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 3: Applikation von Beschichtungssy
- vgb r 10 anlag 3
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Concept of (recurrent) training for performance of non-routine activities in German NPPs - ebookVGB-S-043-00-2016-06-EN-ebookOn the basis of the established practices in German nuclear power plants, and making allowance from the VGB “Concept for the Implementation of Tools for Professional Conduct”, the WG has worked out the principles for such training (target Mehr erfahren150,00 €160,50 € Inkl. MwSt.
-
Recommendations for managing functional safety in steam boiler plants and systems of the water/steam cycle - 2nd revised edition (2020) - ebookVGB-S-008-00-2020-11-EN-ebookThe VGB standard addresses operators of thermal power plants as well as manufacturers and is intended to provide assistance in the application of the standards on functional safety. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Measurement Systems - PrintVGB-S-170-43-2015-07-ENMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Measurement Systems - ebookVGB-S-170-43-2015-07-EN-ebookMeasurement systems in conventional and regenerative power and heat generating plants are an essential part of instrumentation and control systems. They provide the information needed to operate the generating plant and, with the exception of local m Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Lehrgangsempfehlung für die Weiterbildung zum/zur Geprüften Kraftwerker/Kraftwerkerin - PrintVGB-S-037-00-2015-09-DEIn der heutigen Zeit erwarten wir von dem Kraftwerker Fähigkeiten und Fertigkeiten in einem sehr breiten und heterogenen Handlungsspektrum. Der Rahmenstoffplan beinhaltet nicht nur die altbekannten „harten" technischen Kenntnisse sondern a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - PrintVGB-S-130-00-2017-07-DEVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an wassergekühlten Oberflächenkondensatoren - ebookVGB-S-130-00-2017-07-DE-ebookVor über zwanzig Jahren erschien die 1. Ausgabe dieser Richtlinie als Reaktion auf die rasante technische Entwicklung und die damit einhergehende wachsende Bedeutung des Kondensators im Anlagenbau. Nachdem sich nun die Richtlinie in den letzten Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Lehrgangsempfehlung für die Weiterbildung zum/zur Geprüften Kraftwerker/Kraftwerkerin - ebookVGB-S-037-00-2015-09-DE-ebookIn der heutigen Zeit erwarten wir von dem Kraftwerker Fähigkeiten und Fertigkeiten in einem sehr breiten und heterogenen Handlungsspektrum. Der Rahmenstoffplan beinhaltet nicht nur die altbekannten „harten" technischen Kenntnisse sondern a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - PrintVGB-S-169-11-2015-11-ENThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Quality requirements for mineral oils in power transformers - ebookVGB-S-169-11-2015-11-EN-ebookThe objective of the VGB-Standard is to safeguard the required quality criteria for the complete production processes up to and including commissioning and first start-up. It is intended as a pragmatic aid for the users. Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Internal Cleaning of Water-Tube Steam Generating Plants and Associated Pipework - PrintVGB-S-513-00-2014-07-ENThe VGB-Standard shall apply to the cleaning of newly erected steam boiler plants and associated pipework, but, where required, e.g. after longer operational periods, it shall also apply to major repairs and inspections as well as in the case of othe Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - PrintVGB-S-033-00-2017-07-ENThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Interaction of Conformity Assessment and Industrial Safety in Hydropower Plants - ebookVGB-S-033-00-2017-07-EN-ebookThe objective of this VGB-Standard is to provide employers a reference framework for making safe work equipment available in the field of hydropower, which indicates what concrete statutory requirements have to be observed. Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.