Back to Top
- Alternative Suchbegriffe
- conception specifications and performance
- conception specification and performance
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 16
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Concept of (recurrent) training for performance of non-routine activities in German NPPs - ebookVGB-S-043-00-2016-06-EN-ebookOn the basis of the established practices in German nuclear power plants, and making allowance from the VGB “Concept for the Implementation of Tools for Professional Conduct”, the WG has worked out the principles for such training (target Mehr erfahren150,00 €160,50 € Inkl. MwSt.
-
Heat exchangers and boilers in the steam-water cycle of thermal power plants - ebookVGB-S-110-R-00;2012-07.EN-ebookThis VGB standard is intended to enhance the service performance (equipment availability) of heat exchangers and boilers in the water/steam cycle of thermal power stations. The VGB standard consists of a general section for the order and a technical Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - ebookVGB-S-506-00-2019-02-EN-ebookThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Guideline for the Inspection and Evaluation of In-Service Rotors and Casings of Steam and Gas Turbine Generator Sets - ebookR512e-ebookThe necessity of uniformly representing the inspection and evaluation of inservice components in due consideration of damage reported as well as the improvement of manufacturing technology and examination techniques led to the establishment of this g Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - ebookVGB-S-121-00-2016-04-EN-ebookMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Reliability Indicators with KISSY - VGB Research Project 361 (only PDF-download) - PrintTW104VGB Power Plant Information System This report was created by the VGB European Working Group “Performance Indicators”, in order to support the VGB research project “Reliability Indicators with KISSY” lead by DNV KEMA in close Mehr erfahren450,00 €481,50 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.