Back to Top
-
Aufbereitung von Betriebswasser und Kühlturm-Zusatzwasser durch Entcarbonisierung bzw. Flockung und Entcarbonisierung - ebookM403ebookDas Merkblatt ersetzt das VGB-Merkblatt Nr. 13 Planung und Bestellung von Schnellentcarbonisierungsanlagen, das in der ersten Ausgabe 1963 erschienen war. Weitere Verfahren, wie Entcarbonisierung durch Impfung mit Mineralsäuren, Entcarbonisierun Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - ebookVGB-S-165-00-2014-07-EN-eBookThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Qualitätssicherung bei der Fertigung von Generatoren - PrintVGB-S-166-00-2014-02-DEDer VGB-Standard VGB-S-166-00-2014-02-DE soll Käufer und Betreiber von Generatoren dabei unterstützen, schon während der Fertigung die Qualität des Generators sowie seiner Hilfsanlagen und Komponenten zu sichern. Er stellt die Anforderung des VGB Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Qualitätssicherung bei der Fertigung von Generatoren - ebookVGB-S-166-00-2014-02-DE-ebookDer VGB-Standard VGB-S-166-00-2014-02-DE soll Käufer und Betreiber von Generatoren dabei unterstützen, schon während der Fertigung die Qualität des Generators sowie seiner Hilfsanlagen und Komponenten zu sichern. Er stellt die Anforderung des VGB Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Exclusion of foreign material ingress into opened systems/components of nuclear power plants - ebookVGB-S-120-00-2016-02-EN-ebookThe VGB-Standard VGB-S-120 lists measures which are conducive to maintaining cleanliness in the plant (in mechanical, electrical and chemical regards) during maintenance and modification work. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Quality Assurance in the Manufacture of Generators - PrintVGB-S-166-00-2014-02-ENThis VGB-Standard is intended to assist purchasers and operators of generators to assure the quality of the generator and its auxiliary systems and components during the manufacturing phase. It sets out the VGB requirements for quality. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Quality Assurance in the Manufacture of Generators - ebookVGB-S-166-00-2014-02-EN-ebookThis VGB-Standard is intended to assist purchasers and operators of generators to assure the quality of the generator and its auxiliary systems and components during the manufacturing phase. It sets out the VGB requirements for quality. Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - PrintVGB-S-170-12-2018-08-ENThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - ebookVGB-S-040-00-2017-03-EN-ebookThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - ebookVGB-S-506-00-2019-02-EN-ebookThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 1 bis Teil 3 (2023) und Teil 4 (2018) [kostenlos] - ebookVGBE/VGB-S-021-XX-XXXX-DE-ebookDie vgbe/VGB/BAW-Standard-Serie VGBE/VGB-S-021 befasst sich mit Offshore-Bauwerken aus Stahl. Dabei werden in den verschiedenen Teilen alle wesentlichen Gesichtspunkte berücksichtigt, die für einen angemessenen Korrosionsschutz von Bedeutun Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Monitoring concept for oil-cooled transformers in nuclear power plants - ebookM160e-ebookIn order to ensure their high availability, oil-cooled transformers are monitored continuous-ly and subjected to a very wide variety of tests at regular intervals. In an exchange of ex-perience, the operators of all nuclear power plant sites in Germa Mehr erfahren100,00 €107,00 € Inkl. MwSt.