Back to Top
- Alternative Suchbegriffe
- de en 62271 2023 vdew 006 2014 2017 08
- de en 62271 2023 vdew 002 2014 2025 08
- Verwandte Suchbegriffe
- vdew 06 3 2010 03
- vdew 04 3 2012 03
- vdew 07 3 2003 03
- vdew 07 3 2012 03
- vdew 00 3 2015 03
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - PrintVGB-S-811-01-2018-01-ENOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
KKS Identification System for Power Stations - 8th revised edition 2018 (ENGLISH) - ebookVGB-S-811-01-2018-01-EN-ebookOwing to the national and international standardization process, the KKS Identification System for Power Stations (hereinafter referred to as “KKS”) is being replaced by the RDS-PP® Reference Designation System for Power Plants based Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - PrintVGB-S-131-00-2017-07-DEDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Abnahmemessung und Betriebsüberwachung an luftgekühlten Kondensatoren unter Vakuum - ebookVGB-S-131-00-2017-07-DE-ebookDer VGB-Standard VGB-S-131 stellt einheitliche Grundlagen für die Durchführung von Abnahme und Betriebsversuchen an luftgekühlten Kondensatoren für Wasserdampf dar. Sie beschränkt sich auf den Kondensator und schließt d Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Instandhaltung in Kraftwerken 2008 - PrintTB141-08(CD)Vorträge Mehr erfahren98,00 €104,86 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Analyse der Nichtverfügbarkeit von Kraftwerken 2012 – 2021, Ausgabe 2022 (KISSY Datenbank-Auswertung) - ebookVGB-TW-103A-2022-ebookMit dem Ziel, den Betrieb von Kraftwerksanlagen und die Anlagen selbst zu bewerten, zu vergleichen und zu optimieren, sammelt VGB seit 1970 nach einheitlichen Definitionen und Ermittlungsverfahren Daten über die Verfügbarkeit und Ausnutzung Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - PrintVGB-S-123-00-2017-06-DEDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden zum Thema „Pre-Job Briefing“ und „Post-Job Debriefing“ - ebookVGB-S-123-00-2017-06-DE-ebookDas Pre-Job-Briefing und das Post-Job-Debriefing sind gezielt auf eine jeweilige Tätigkeit bezogene Besprechungen. Das Pre-Job Briefing (PJB) wird unmittelbar vor der Durchführung von komplexen oder nicht routinemäßigen Täti Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - PrintVGB-S-131-00-2017-07-ENThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Air-Cooled Condensers under Vacuum - ebookVGB-S-131-00-2017-07-EN-ebookThis guideline is meant to provide a standardized basis for acceptance and operating tests of air-cooled water steam condensers. Its scope of application is limited to the testing of the condenser itself and the exhaust steam duct up to the terminal Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - PrintVGB-S-006-00-2012-09-DEDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Probenahme und physikochemische Überwachung von Wasser- und Dampfkreisläufen - ebookVGB-S-006-00-2012-09-DE-ebookDer hier vorliegende VGB-Standard VGB-S-006-00-2012-09-DE soll, ergänzend zum VGB-Standard VGB-S-010-T-00;2011-12.DE „Speisewasser-, Kesselwasser- und Dampfqualität für Kraftwerke/Industriekraftwerke“ (früher VGB-Richt Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
KKS Begriffszuordnungsliste zum Aggregate- und Betriebsmittelschlüssel (Deutsch) - ebookB105.1-ebookDie Sprache der Kraftwerkstechnik kennt für Aggregate, Komponenten, Einrichtungen, Geräte unterschiedliche Begriffe. Sowohl im Aggregate- als auch im Betriebsmittelschlüssel des KKS sind jedoch den einzelnen klassifizierenden Kennbuchs Mehr erfahren30,00 €32,10 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Anleitung zur Beschaffung von Dampfturbinenanlagen - PrintVGB-S-145-00-2015-11-DEDie VGB-S-145-00 dient als Rahmengerüst zur Erstellung allgemeiner und technischer Vertragsbedingungen zur Beschaffung von Dampfturbinenanlagen für den Einsatz in Anlagen zur Energieerzeugung (Kraftwerke). Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - PrintVGB-S-221-00-2014-06-ENVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Equipment for Cleaning of Heat Transfer Surfaces in Steam Raising Plants - Operation, Maintenance and Expert Systems - ebookVGB-S-221-00-2014-06-EN-ebookVery substantial advances have been made over the last couple of years in the field of heat transfer surface cleaning which are included in the present revision of the Standard (cf. first edition). New methods like explosion cleaning are now included Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.



















