Back to Top
- Alternative Suchbegriffe
- vgb richtlinien for schrauben im bereich hoher temperatur
- vgb richtlinien for schrauben im bereich hohe temperaturen
- Verwandte Suchbegriffe
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2
- VGB-R 108e Fire Protection in Power Plants – 2011 978-3-86875-544-2 englisch
- VGB/BAW-Standard "Korrosionsschutz von Offshore-Bauwerken zur Nutzung der Windenergie - Teil 3: Applikation von Beschichtungssy
- vgb r 11 anhang 3
- vgb r 12 anlag 3
-
Guideline for the Construction and Operation of Ash Handling Plants - ebookR201e-ebookThis Guideline applies to ash handling facilities for steam boilers, extending from the collection points of the combustion residues up to the places of dispatch from the delineated power station area. Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
KKS Identification System for Power Stations - Key Part: Function Keys, Equipment Unit Keys, Component Keys - Excel-table (English edition)KKS-Basis-EXCEL-ENKKS Identification System for Power Stations, VGB-Standard VGB-S-811-01-2018-01-EN. Excel-table of the Key Part (English edition, German edition available): Function Keys, Equipment Unit Keys, Component Keys Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Rohre für Kondensatoren und andere Wärmeaustauscher für den Betrieb von Dampfturbinenanlagen - Nichtrostende Stähle - ebookR113ebookDie Richtlinien „Rohre für Kondensatoren und andere Wärmeaustauscher für den Betrieb von Dampfturbinenanlagen“ sind derzeit in drei Werkstoffgruppen (R 106 „Kupferlegierungen“, R 113 „Nichtrostende Stä Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Auslegung, Prüfung und Montage von Durchflussmessstrecken mit Drosselgeräten - PrintVGB-S-150-24-2020-08-DEDer vorliegende VGB-Standard VGB-S-150-24 „Auslegung, Prüfung und Montage von Durchflussmessstrecken mit Drosselgeräten“ wurde durch ein Team der VGBFachgruppe „Abnahmetests und Kontrolluntersuchen“ bearbe Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Auslegung, Prüfung und Montage von Durchflussmessstrecken mit Drosselgeräten - ebookVGB-S-150-24-2020-08-DE-ebookDer vorliegende VGB-Standard VGB-S-150-24 „Auslegung, Prüfung und Montage von Durchflussmessstrecken mit Drosselgeräten“ wurde durch ein Team der VGBFachgruppe „Abnahmetests und Kontrolluntersuchen“ bearbe Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Invitation to Tender Criteria for Heat Recovery Steam Generators Downstream of Gas Turbines - ebookM222e-ebookUpon the initiative of the VGB Committee “Steam Generators“ a special working group was founded to establish criteria for invitations to tender of heat recovery steam generators downstream of gas turbines. *Dieses Produkt ist ebenfalls i Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - Print & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUSZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
vgbe-Abkürzungskatalog für Anlagen der Energieversorgung / vgbe abbreviation-catalog for power supply units - ebook & Excel-ListeVGBE-S-891-00-2024-04-DE-EN-PLUS-ebookZiel des vorliegenden VGBE-Abkürzungskatalogs VGBE-S-891-00-2024-04-DE-EN ist es die Systematik zur Bildung von Abkürzungen zu regeln. Durch Festschreibung von Abkürzungen für Begriffe für Anlagen der Energieversorgung wird Planern, Errichtern u Mehr erfahren1.085,00 €1.160,95 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - PrintVGB-S-133-00-2018-07-ENServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for the Inspection of Turbo Gear Units Mounted on Plain Bearings - ebookVGB-S-133-00-2018-07-EN-ebookServicing and maintenance have always been a basic precondition for economical long-term operation of a plant. Maximum availability and efficient plant and equipment are essentials for any operator. Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Recommendations for Design and Properties of Waste-fuelled Steam Generators - Second Edition 2009 - ebookM216e-ebookWe expect that this second edition of the Instruction sheet, which is now entitled 'Recom-mendations for Design and Warranties of Waste-fuelled Steam Generators' will not only be beneficial for the purchasers but also for the suppliers of waste incin Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Tubes for Condensers and Other Heat Exchangers (Part C “Titanium”) - ebookR114e-ebookThe guidelines are intended to provide information to the operating company of combined heat and thermal power plants so that they can order the correct piping for condensers and heat exchangers and also to help them prevent faults and damage. To all Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
RDS-PP® – Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (Print)VGB-S-823-31-2014-12-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie - Teil 31: Wasserkraftwerke (eBook)VGB-S-823-31-2014-12-EN-DE-eBookDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Planung und Bestellung von Anlagen zur Minderung von Staubemissionen - ebookR301ebookDie Richtlinie VGB-R301 deckt einige Grundanforderungen für Lieferverträge ab, weist aber darüber hinaus auf eine Vielzahl notwendiger Vereinbarungen hin. Diese müssen bereits im Planungszustand beachtet und spätestens bei de Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Hinweise zur Auftragsabwicklung - ebookM520ebookIn der Angebotsphase und vor der Auftragsvergabe sind klare Festlegungen für die Qualitätsanforderungen zu treffen, das heißt, außer dem ausgewählten/ vereinbarten Regelwerk sind VGB-Richtlinien und Merkblätter sowie d Mehr erfahren70,00 €74,90 € Inkl. MwSt.
-
Kohlenbunker - Planung, Gestaltung, Ausrüstung und Betrieb - ebookM206ebookVon den Hilfseinrichtungen, die zum Betrieb eines kohlebefeuerten Dampferzeugers erforderlich sind, kommt den Kohlebunkern eine besondere Bedeutung zu. Da sich Bunker und zugehörige Abzugseinrichtungen in ihrer Wirkungsweise wechselseitig beeinf Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 01: Kraftwerke, Allgemein RDS-PP Application Guideline Part 01: Power Plants, General - PrintVGB-S-823-01-2015-09-EN-DEDie Anwendungsrichtlinienreihe VGB-S-823 unterstützt die sachgerechte Umsetzung der allgemeinen Kennzeichnungsnormen für die Kraftwerksbranche und verdeutlicht dies mit praxisbezogenen Beispielen. Sie besteht aus einem allgemeinen Teil, der Mehr erfahren585,00 €625,95 € Inkl. MwSt.