Back to Top
- Alternative Suchbegriffe
- internal cleaning of water tube steam generating plants and
- interval cleaning of water tube steam generating plant and
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- plants fur de mann kauf
- plants fur de mann kaufer
- plants fur de matt kaufer
- änderungsblatt zu vgb b 12
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Availability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ve-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about availability and utiliz Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (2013, as per 2012-12) - ebookTW805e-13-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
International Conference on water chemistry of nuclear reactor systems - PrintTB430-08(CD)VGB-Konferenz "NPC'08" Mehr erfahren198,00 €211,86 € Inkl. MwSt.
-
KKS Application Explanations for Hydro Power Plants - PrintB106D1eThe plant identification rules (guidelines, keys, and application explanations), edited by VGB Power Tech as part of the Identification System for Power Stations (KKS), leave room for different ways of identification to meet the requirements of the v Mehr erfahren64,00 €68,48 € Inkl. MwSt.
-
KKS Application Explanations for Hydro Power Plants - ebookB106D1e-ebookThe plant identification rules (guidelines, keys, and application explanations), edited by VGB Power Tech as part of the Identification System for Power Stations (KKS), leave room for different ways of identification to meet the requirements of the v Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Chimneys for Operation without Flue Gas Reheating after FGD - ebookM643e-ebookThe enactment of the amended version of the 13th Ordinance for the Implementation of the Federal Immission Control Act (13. BImSchV; Ordinance on Large Combustion and Gas Turbine Plants, [1]) in July 2004 effectively aligned the German ambient pollut Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - PrintVGB-S-609-00-2016-03-ENThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - PrintVGB-S-170-12-2018-08-ENThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Compendium “Best Practices for Coal-Based Power Plants in Germany” - ebookVGB-B032-ebookThe aim of this “Best Practices” study is to identify the approaches taken by the German power industry for building and operating coal-based power plants and to compile these in one place. This study provides a comprehensive ov Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
Modelling primary NOx and primary N2O of Pulverised, Fuel Combustion and Circulating Fluidised Bed Combustion (Frans van Dijen) - PrintB15ABSTRACT With more stringent emission limits with time, including NOx and N2O, and due to the high costs of secondary measures for NOx emissions reduction, knowledge of primary NOx and primary N2O is very important. With this knowledge, primary NOx Mehr erfahren91,59 €98,00 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key / ENGLISH) - PrintVGB-S-821-00-2016-06-ENThe basic international standards for reference designation provide users with generally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants estab Mehr erfahren680,00 €727,60 € Inkl. MwSt.