Back to Top
- Alternative Suchbegriffe
- de en 62271 2014 vdew 03 2012 2012 08
- de en 62271 2015 vdew 03 2012 2012 08
- Verwandte Suchbegriffe
- vdew 00 3 2023 03
- vdew 01 3 2012 03
- vdew 010 3 2012 03
- vdew 00 3 2022 03
- vdew 007 3 2012 03
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebookVGB-S-036-00-2017-04-EN-ebookThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Werkstoffspezifikation für drucktragende Komponenten in fossil befeuerten Kraftwerken - Material specification for components under pressure in fossil-fired power plants - ebookVGB-S-109-00-2012-08-DE-EN-ebookDieser VGB-Standard gilt für die Dampfkesselbaugruppe und Rohrleitungen des Wasser-/Dampfkreislaufes. Sie soll zwischen Auftraggeber, Hersteller und Werkstoffhersteller bzw. -lieferant eindeutige Festlegungen für den Liefervertrag und f&uum Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Lernzielkontrollen in der Aus- und Weiterbildung von Kernkraftwerkspersonal - PrintVGB-S-028-00-2012-03-DELernzielkontrollen sollen grundsätzlich fester Bestandteil jeder Schulungsmaßnahme sein. Deshalb richtet sich dieser VGB-Standard an die Ausbilder/Referenten, die Lernenden und das für die Schulungsmaßnahme verantwortliche Personal. Bei der Erst Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Bautechnik bei Kernkraftwerken - PrintVGB-S-026-00-2012-08-DEDieser VGB-Standard soll Planern, Erstellern/Lieferanten, Betreibern, Behörden und weiteren interessierten Kreisen eine Unterlage (basierend auf deutschen atomrechtlichen Grundsätzen) bieten, in der die besonderen bautechnischen Anfor Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Zentrale Zuverlässigkeits- und Ereignisdatenbank - Zuverlässigkeitskenngrößen für Kernkraftwerkskomponenten (2015, Stand: 2014-12) - ebookTW805-15-ebookDie Zentrale Zuverlässigkeits- und Ereignisdatenbank (ZEDB) stellt Zuverlässigkeitsdaten für die probabilistischen Sicherheitsanalysen (PSA) bereit, die die Betreiber von Kernkraftwerke durchführen bzw. fortschreiben. In dieser Da Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Lernzielkontrollen in der Aus- und Weiterbildung von Kernkraftwerkspersonal - ebookVGB-S-028-00-2012-03-DE-ebookLernzielkontrollen sollen grundsätzlich fester Bestandteil jeder Schulungsmaßnahme sein. Deshalb richtet sich dieser VGB-Standard an die Ausbilder/Referenten, die Lernenden und das für die Schulungsmaßnahme verantwortliche Personal. Bei der Erst Mehr erfahren65,00 €69,55 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - PrintVGB-S-504-00-2015-12-ENSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Inspection and Testing of Large Forgings and Castings for Steam and Gas Turbine Generator Sets - ebookVGB-S-504-00-2015-12-EN-ebookSafe operation and high availability of turbine systems make great demands on the reliability and consequently on the quality of the components used. The experience gained in the fabrication of large forgings and castings has been evaluated and consi Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Maschinentechnischer Blockschutz für Wärmekraftwerke - ebookR117ebookDie Richtlinie hat das Ziel, Empfehlungen für die Auslegung, Ausführung und Prüfung von Schutzeinrichtungen zu geben . Sie enthält eine Zusammenstellung von Zuverlässigkeitsanforderungen an die Gerätetechnik und Anforder Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - PrintVGB-S-823-32-2021-12-EN-DEDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energiebran Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
RDS-PP® – Application Guideline; Part 32: Wind Power Plants; Anwendungsrichtlinie, Teil 32: Windkraftwerke, 2nd Edition / 2. Ausgabe - ebookVGB-S-823-32-2021-12-EN-DE-ebookDie Anwendungsrichtlinie RDS-PP®, Teil 32: Windkraftwerke, umfasst die sachgerechte und anwendungsorientierte Umsetzung für den gesamten Bereich der Windenergienutzung auf Grundlage der allgemeinen Kennzeichnungsnorm für die Energi Mehr erfahren645,00 €690,15 € Inkl. MwSt.
-
Betrieb von Dampfkesselanlagen Anforderungen an den Betreiber für den Betrieb von Dampfkesselanlagen der Kategorie III (ab 1.000 bar/Liter) und IV - PrintVGB-S-031-00-2012-08-DEMit dem Inkrafttreten der Betriebssicherheitsverordnung (BetrSichV) vom 27. September 2002 setzte für den Betrieb von überwachungsbedürftigen Anlagen ein Paradigmenwechsel im Technischen Regelwerk ein. An Stelle eines bisher anlagenspe Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Betrieb von Dampfkesselanlagen Anforderungen an den Betreiber für den Betrieb von Dampfkesselanlagen der Kategorie III (ab 1.000 bar/Liter) und IV - ebookVGB-S-031-00-2012-08-DE-ebookMit dem Inkrafttreten der Betriebssicherheitsverordnung (BetrSichV) vom 27. September 2002 setzte für den Betrieb von überwachungsbedürftigen Anlagen ein Paradigmenwechsel im Technischen Regelwerk ein. An Stelle eines bisher anlagenspe Mehr erfahren220,00 €235,40 € Inkl. MwSt.