Maintenance-compatible documentation - ebookVGB-S-029-S-00;2012-03-EN-ebookMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Maintenance-compatible documentation - PrintVGB-S-029-S-00;2012-03-ENMaintenance of conventional power generation facilities is increasingly required to meet demands for maximum cost-effectiveness together, wherever possible, with rising quality. The industrial health and safety regulations require operators to take o Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Function-related Documentation of Power Plant Instrumentation and Control in Line with Operating Requirements - ebookR170Ce-ebookThe first edition of the Guideline “Function-related documentation of power plant instrumentation and control in line with operating requirements", original title "Richtlinie für die betriebsgerechte, funktionsbezogene Dokumentation der Kr Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - PrintVGB-S-006-00-2012-09-ENThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - ebookVGB-S-401-00-2020-05-EN-ebookAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
VGB-Standard for the Water in Nuclear Power Plants with Light-Water Reactors Part 1: PWR Part 2: BWR - PrintVGB-S-401-00-2020-05-ENAlmost half a century after publication of the first edition of a VGB-Guideline for the Water in Nuclear Power Plants with Light-Water Reactors and approx. 13 years after the third edition in 2006, the task of a renewed adaptation of the Guideline fo Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - ebookVGB-S-040-00-2017-03-EN-ebookThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Recommendations for Control and Lubrication Systems of Steam and Gas Turbine Installations - ebookM109e-ebookThe present recommendations are primarily concerned with the technical requirements to be fulfilled by the control and lubrication Systems of steam and gas turbine installations. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - PrintVGB-S-164-12-2016-10-ENThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Avoidance of generator damage resulting from condensation on live parts - ebookVGB-S-164-12-2016-10-EN-ebookThe moisture contained in gaseous substances condenses on impact with colder surfaces to a greater of lesser extent, depending on the ambient conditions and in particular on pressure and temperature. If this occurs in the area of non-insulated electr Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Protective Measures Against Vehicle Impact - ebookM620e-ebookWithin this instruction sheet protective measures, based on relevant actual standards, against the actions of deviating vehicles (vehicle impact) on buildings, civil structural parts and mechanical components in conventional power plants and comparab Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.