Back to Top
- Verwandte Suchbegriffe
- heat 3 grundlagen und systematik der verfügbarkeitsermittlung for wärmekraftwerke
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerk
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung fur warmekraftwerken
- heat 3 grundlagen und systematik de verfügbarkeitsermittlung for wärmekraftwerke
-
Monitoring, limiting and protection devices on steam turbine plants - PrintVGB-S-103-00-2020-02-ENThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on steam turbine plants - ebookVGB-S-103-00-2020-02-EN-ebookThis standard is addressed to manufacturers, service providers and operators of steam turbine plants and is in particular to assist operators in equipping their steam turbine plants. The safe operation of steam turbines makes great demands on Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Recommendation for the Introduction of Risk Based Maintenance - ebookM130e-ebookThe aim of the liberation of the European energy market was and is the competition of the operating companies at the market, of which more efficiency and noticeably low prices for the customers should be achieved. Due to this transition, from a Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendation for the Introduction of Risk Based Maintenance - ebookM131ebookThe aim of the liberation of the European energy market was and is the competition of the operating companies at the market, of which more efficiency and noticeably low prices for the customers should be achieved. Due to this transition, from a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Recommendation for the Introduction of Risk Based Maintenance - ebookM131e-ebookThe aim of the liberation of the European energy market was and is the competition of the operating companies at the market, of which more efficiency and noticeably low prices for the customers should be achieved. Due to this transition, from a Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - PrintVGB-S-123-00-2017-06-ENThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - PrintVGB-S-162-00-2020-02-ENFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Electrical Generating Unit Protection - 1st revised edition - ebookVGB-S-162-00-2020-02-EN-ebookFive years after the first publication and based on the initiative of the VGB technical group “Electrical Equipment”, the necessity of a revision to the VGB Standards “Electrical Unit Protection” (VGB-SO25) was discussed. As a Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Quality Requirements for District Heating Water - ebookM410e-ebookAs a result of the increasing importance of district heating in the context of energy supply, the VGB Expert Committee "Water Chemistry in Thermal Power Plants" has produced a revised edition of the Instruction Sheet "Quality Requirements for Distric Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Guidelines for Ordering High-capacity Steam Boilers - ebookR101e-ebookThis guideline R 101 He gives guidance on writing the technical and commercial contract terms for the procurement of water tube boilers for use in electricity generating stations (power stations). Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - PrintVGB-S-145-00-2015-11-ENThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - PrintVGB-S-602-00-2016-04-ENThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Indication and Application of Actions on Buildings in Power Plants - ebookVGB-S-602-00-2016-04-EN-ebookThe aim of this VGB standard is to provide a consistent procedure for the definition, classification and processing of actions on load-bearing structures for the construc-tion of power plants. It is also intended to cover significant influences of op Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.