Back to Top
- Alternative Suchbegriffe
- ordering of pip systems in thermal po
- ordering of pipes systems in thermal po
- Verwandte Suchbegriffe
- pipes fur de mann kauf
- pipe for de mann kauf
- pipes for de mann kauf
- pipes fur mann ☉
- pipes fur mann
-
Guide for the Procurement of Steam Turbine Plants - ebookVGB-S-145-00-2015-11-EN-ebookThe VGB-Standard VGB-S-145 for the procurement of steam turbine plants is intended to provide a general guideline for establishing general and technical terms of contract for the purchase of steam turbine plants to be used in power generation (power Mehr erfahren460,00 €492,20 € Inkl. MwSt.
-
Basic Terms of the Electric Utility Industry, 11th edition, free of charge - ebookVGB-S-002-01-2019-05-EN-ebookAs a result of the now almost global energy transition and the associated requirements for the ever-increasing regulation of the markets while securing competition, the number of terms used and their definitions continues to increase. In&nb Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Soft Rubber Linings in Flue Gas Desulphurization Test Procedures to Determine Suitability testing Criteria and Standard Values for the Assessment of Service Life - ebookM417e-ebookThis Instruction Sheet is subdivided into two sections. The first section describes the test procedures employed to determine the suitability of soft rubber linings in flue gas desulphurization plants while the second section deals with the testing c Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - PrintVGB-S-130-00-2017-07-ENMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Acceptance Test Measurements and Operational Monitoring of Water-Cooled Surface Condensers - ebookVGB-S-130-00-2017-07-EN-ebookMore than twenty years ago, in 1994, the first edition of this standard was published in response to the rapid technological development and the growing importance of condensers in plant construction. Now that the standard has been tried and tested i Mehr erfahren270,00 €288,90 € Inkl. MwSt.
-
Dust concentration measurement in flue gases, avoiding theinfluence of sulphuric acid aerosols on the measured value to a large extent - ebookM301e-ebookResponding to growing demands of the European environmental legislation, power plant operators are increasingly focusing on the topic of dust emission measurement again. Several independent studies provide evidence that the generally applied methods Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Modelling primary NOx and primary N2O of Pulverised, Fuel Combustion and Circulating Fluidised Bed Combustion (Frans van Dijen) - PrintB15ABSTRACT With more stringent emission limits with time, including NOx and N2O, and due to the high costs of secondary measures for NOx emissions reduction, knowledge of primary NOx and primary N2O is very important. With this knowledge, primary NOx Mehr erfahren91,59 €98,00 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants - Letter Codes for Basic Functions and Product Classes - ebookB102ebookDie Richtlinie VGB-B102 ist für die Kennzeichnung der Grundfunktionen und Produktklassen in Kraftwerken anzuwenden. *Zweisprachige Ausgabe: Deutsch und Englisch The guideline VGB-B102 has to be used for the designation of the basic functions, Mehr erfahren350,00 €374,50 € Inkl. MwSt.
-
Code of Practice for Lifecycle Management of Reinforced Concrete Cooling Towers in Power Plants - ebookR613e-ebookThis Guideline addresses the lifecycle management of reinforced concrete cooling towers. Lifecycle management comprises maintenance of the structure and measures to ensure the safety of a cooling tower. Effective lifecycle management must be preventi Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
RDS-PP® Referenzkennzeichensystem für Kraftwerke - Kennbuchstaben für Grundfunktionen und Produktklassen / Reference Designation System for Power Plants - Letter Codes for Basic Functions and Product Classes - PrintB102Die Richtlinie VGB-B102 ist für die Kennzeichnung der Grundfunktionen und Produktklassen in Kraftwerken anzuwenden. Hinweis: Das vollständige RDS-PP® umfasst die Publikationen VGB-S-821-00 und VGB-B 102. *Zweisprachige Ausgabe: D Mehr erfahren350,00 €374,50 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - PrintVGB-S-831-00-2015-05-ENReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Provision of Technical Documentation (Technical Plant Data, Documents) for Energy Supply Units - ebookVGB-S-831-00-2015-05-EN-ebookReplaced by multi-part publication VGBE-S-831; still available for existing installations. The Guideline applies to the entire technical documentation (technical plant data and documents) which is necessary in the performance of projects, e.g. in pl Mehr erfahren630,00 €674,10 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - ebookVGB-S-165-00-2014-07-EN-eBookThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the improvement of H2 safety at hydrogen-cooled generators - PrintVGB-S-165-00-2014-07-ENThe aim of these recommendations for improving H2 safety is to provide information for designing, constructing, modernising/refurbishing and operating hydrogen-cooled generators in power plants. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendation for Design and Operation of Vacuum Pumps at Steam Turbine Condensers - ebookR126e-ebookDue to the development towards larger outputs in power Stations, it was necessary for the design of air extraction pumps for surface condenser units to keep pace. For this purpose water-, air- or steam ejectors and water ring pumps or combinati Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Änderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards kostenlos/free of charge - ebookvgbe-aenderung-fcÄnderungsblätter zum vgbe/VGB-Regelwerk / Amendments to vgbe/VGB standards (kostenlos/free of charge): VGB-B 108 (2014-11) | VGB-S-811 (2019-11 ed. 2022-12) | VGB-S-821 (2019-11 ed. 2022-12) VGB-S-823-31 (2018-10) | VGB-S-832 (2020-05, zur& Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Compendium “Best Practices for Coal-Based Power Plants in Germany” - ebookVGB-B032-ebookThe aim of this “Best Practices” study is to identify the approaches taken by the German power industry for building and operating coal-based power plants and to compile these in one place. This study provides a comprehensive ov Mehr erfahren480,00 €513,60 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.