Back to Top
- Alternative Suchbegriffe
- kks and 86 978 and plants plat
- kks and 86 978 and plant plus
- Verwandte Suchbegriffe
- 978 3 86875 2012 2
- 978 3 86875 2015 2
- 978 3 86875 07 5
- 978 3 86875 06 5
- 978 3 86875 01 5
-
Measures for the avoidance and handling of instrumentation and control equipment failures - ebookVGB-S-170-12-2018-08-EN-ebookThe former VGB Guideline VGB-R 170 A1e “Measures for the avoidance and handling of instrumentation and control equipment failures” was used since 2005 for the support during the specification and assessment of control and instrumentation Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - ebookVGB-S-036-00-2017-04-EN-ebookThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
Preservation of Steam and Gas Turbo-Generator Sets - 2nd edition - PrintVGB-S-036-00-2017-04-ENThe editorial team has decided to take the steam turbine and the generator from the VGB-R 116 “Preservation of Power Plants” (republished as VGB-S-116-00-2016-04- EN “Preservation of Power Plants”), to add a section on the gas Mehr erfahren280,00 €299,60 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - ebookVGB-S-811-01-2018-01-DE-ebookDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - 8. überarbeitete Ausgabe 2018 (DEUTSCH) - PrintVGB-S-811-01-2018-01-DEDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren680,00 €727,60 € Inkl. MwSt.
-
Guideline for Acceptance Tests on Water-Electrolysis Plants - ebookVGBE-S-159-00-2024-07-EN-ebookTo develop the full potential of water electrolysis, it is crucial that the systems work reliably and efficiently. This requires a standardised and binding basis for proof of guaranteed performance of water electrolysis plants as a milestone on the w Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Application, design and quality assurance criteria for the use of fibre-reinforced plastics in power plant construction - PrintVGB-S-609-00-2016-03-ENThis VGB-Standard replaces the former VGB guideline VGB-R 609e, which had the same title and dates from 2003. Mehr erfahren220,00 €235,40 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.
-
Modelling primary NOx and primary N2O of Pulverised, Fuel Combustion and Circulating Fluidised Bed Combustion (Frans van Dijen) - PrintB15ABSTRACT With more stringent emission limits with time, including NOx and N2O, and due to the high costs of secondary measures for NOx emissions reduction, knowledge of primary NOx and primary N2O is very important. With this knowledge, primary NOx Mehr erfahren91,59 €98,00 € Inkl. MwSt.
-
Industrial Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning - ebookM642e-ebookThe VGB Instruction Sheet titled "Chimneys - Evaluation of the Construction Methods, Notes on Design and Commissioning", first edition, 1990, has assisted operators, designers and suppliers in the field of processes and design by conveying a wide ran Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - PrintVGB-S-115-00-2016-01-ENThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for the Inspection and Overhaul of Steam Turbines - ebookVGB-S-115-00-2016-01-EN-ebookThese recommendations provide guidelines for scheduling inspections and overhauls, taking into account the type of turbine, the design, the monitoring and diagnostic equipment, the operation regime, the duty and the age of the unit. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
KKS Kraftwerk-Kennzeichensystem - Schlüsselteil: Funktionsschlüssel, Aggregateschlüssel, Betriebsmittelschlüssel - als Excel-Liste (Deutschsprachige 8. Ausgabe)KKS-Basis-EXCEL-DEDurch den nationalen und internationalen Normungsprozess wird das Kraftwerk-Kennzeichen-System (nachfolgend KKS) durch das, auf DIN ISO 81346-10 basierende RDS-PP®, abgelöst. RDS-PP® gilt damit „als anerkannte Regel der Technik&ldq Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.



















