Back to Top
- Alternative Suchbegriffe
- de en 62271 2016 vdi 01 2024 2015 08
- de en 62271 201 vdi 014 2024 2015 08
- Verwandte Suchbegriffe
- vdi 006e 3 2012 03
- vdi 06 3 2010 03
- vdi 03 3 2010 03
- vdi 004 3 2010 03
- vdi 024 3 2010 03
-
Guide on “Pre-Job Briefing” and “Post-Job Debriefing” - ebookVGB-S-123-00-2017-06-EN-ebookThe pre-job briefing and the post-job debriefing are meetings that focus on a specific activity. The pre-job briefing (PJB) is scheduled to take place immediately before the carrying out of complex or non-routine jobs and is intended to ensure that a Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Leitfaden für das Lebensdauermanagement von Stahlbeton-Kühltürmen in Kraftwerken - ebookR613ebookDie vorliegende Richtlinie behandelt das Lebensdauermanagement von Stahlbeton-Kühltürmen. Dieses umfasst die Bauwerksunterhaltung mit den Maßnahmen, die die Sicherheit eines Kühlturmes gewährleisten. Ein wirkungsvolles Leben Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Leitfaden für Abnahmeversuche an Wasser-Elektrolyseanlagen - PrintVGBE-S-159-00-2024-07-DEUm das volle Potenzial der Wasser-Elektrolyse zu entfalten, ist es entscheidend, dass die Anlagen zuverlässig und effizient arbeiten. Dazu bedarf es einer einheitlichen und verbindlichen Basis für Leistungsnachweise von Wasser-Elektrolysean Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Leitfaden für Abnahmeversuche an Wasser-Elektrolyseanlagen - ebookVGBE-S-159-00-2024-07-DE-ebookUm das volle Potenzial der Wasser-Elektrolyse zu entfalten, ist es entscheidend, dass die Anlagen zuverlässig und effizient arbeiten. Dazu bedarf es einer einheitlichen und verbindlichen Basis für Leistungsnachweise von Wasser-Elektrolysean Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - ebookVGB-S-823-41-2018-07-EN-DE-ebookDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
RDS-PP® Anwendungsrichtlinie Teil 41: Power to Gas - Application Guideline Part 41: Power to Gas - PrintVGB-S-823-41-2018-07-EN-DEDiese RDS-PP®-Anwendungsrichtlinie für Power to Gas Anlagen wurde von einer Projektgruppe der VGB-Fachgruppe „Anlagenkennzeichnung und Dokumentation“ in enger Zusammenarbeit mit Herstellern und Betreibern erarbeitet. This RD Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Zentrale Zuverlässigkeits- und Ereignisdatenbank - Zuverlässigkeitskenngrößen für Kernkraftwerkskomponenten (Ausgaben 2007-2012) - ebookTW805-07-12-ebookDie Zentrale Zuverlässigkeits- und Ereignisdatenbank (ZEDB) stellt Zuverlässigkeitsdaten für die probabilistischen Sicherheitsanalysen (PSA) bereit, die die Betreiber von Kernkraftwerke durchführen bzw. fortschreiben. In dieser Da Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Planung und Betrieb von Kühltürmen - ebookVGBE-S-135-00-2024-05-DE-ebookDer vorliegende neue vgbe-Standard „Planung und Betrieb von Kühltürmen“ bezweckt die Zusammenfassung vorhandener Informationen über wesentliche Gesichtspunkte dieses Sachgebietes für Planer und Betreiber. Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Planung und Betrieb von Kühltürmen - PrintVGBE-S-135-00-2024-05-DEDer vorliegende neue vgbe-Standard „Planung und Betrieb von Kühltürmen“ bezweckt die Zusammenfassung vorhandener Informationen über wesentliche Gesichtspunkte dieses Sachgebietes für Planer und Betreiber. Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
RDS-PP® Reference Designation System for Power Plants - Letter Code for Power Plant Systems (System Key) - Excel-table (English edition)RDS-PP-EXCEL-ENThe basic international standards for reference designation provide users with gen-erally applicable general rules and letter codes for main classes for the designation of technical objects and their documentation. The standard for power plants esta Mehr erfahren2.950,00 €3.156,50 € Inkl. MwSt.
-
RDS-PP® Pocketbook, English, 2nd edition - PrintVGBE-S-821-91-2021-12-ENThe 2nd edition of the RDS-PP Pocketbook for conventional, nuclear, renewable energy plants, storage and power-2-x has been published as update VGBE-S-821-91-2021-09-EN.The 2019/11 additions to the system key are taken into account. The RDS-PP Pocket Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Design and operation of cooling towers - PrintVGBE-S-135-00-2024-05-ENThis new vgbe standard “Design and Operation of Cooling Towers” is intended to replace the old guidelines VGB-R 135e* “Planning of Cooling Towers” and VGB-R 129* “Recommendations for Winter Operation of Power Plant Wet Cooling Towers” (Ge Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Design and operation of cooling towers - ebookVGBE-S-135-00-2024-05-EN-ebookThis new vgbe standard “Design and Operation of Cooling Towers” is intended to replace the old guidelines VGB-R 135e* “Planning of Cooling Towers” and VGB-R 129* “Recommendations for Winter Operation of Power Plant Wet Cooling Towers” (Ge Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Zentralwarte - ebookVGBE-S-179-00-2023-09-DE-ebookMit diesem vgbe-Standard „Zentralwarte“ werden Betreibern von Energieanlagen Leitlinien an die Hand gegeben, welche vorbereitenden Maßnahmen anzustrengen sind, um Energieanlagen an verschiedenen Standorten mit gegebenenfalls untersc Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Zentralwarte - PrintVGBE-S-179-00-2023-09-DEMit diesem vgbe-Standard „Zentralwarte“ werden Betreibern von Energieanlagen Leitlinien an die Hand gegeben, welche vorbereitenden Maßnahmen anzustrengen sind, um Energieanlagen an verschiedenen Standorten mit gegebenenfalls untersc Mehr erfahren135,00 €144,45 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - PrintVGB-S-219-00-2015-03-ENAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Refractory Lining in Fluidised Bed Combustion Plant - ebookVGB-S-219-00-2015-03-EN-eBookAdvice for Ordering, Design, Construction and Operation of Refractory Lining in Fluidised Bed Combustion Plant Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Teil A: Überwachung von gebrauchten Turbinenölen in Dampf- und Gasturbinen / Teil B: Überwachung von gebrauchten schwer entflammbaren Flüssigkeiten in Dampf- und Gasturbinen - ebookVGB-S-416-00-2014-08-DE-ebookTeil A beschreibt eine sinnvolle Überwachung von Gebrauchtölen in Turbinenanlagen. Turbinenöle sind im Betrieb durch thermische, chemische, physikalische und mechanische Einflüsse Veränderungen unterworfen. In der Regel f&uum Mehr erfahren240,00 €256,80 € Inkl. MwSt.



















