Back to Top
- Alternative Suchbegriffe
- 1.5e 202 nvopzp and 1 1 or it
- 1.5e 201 nvopzp and 1 1 or it
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 101
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 106
- änderungsblatt zu vgb b 16
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Centralized Reliability and Events Database – Reliability Data for Nuclear Power Plant Components (editions 2007-2011) - ebookTW805e-07-12-ebookThe Centralized Reliability and Events Database (ZEDB1) provides reliability data that can be used in ongoing and future probabilistic safety analyses (PSAs) conducted by the owners/operators of nuclear power plants contributing to the database. (Thi Mehr erfahren999,00 €1.068,93 € Inkl. MwSt.
-
Calculation of Reliability Data using Two-Stage Bayesian Models T-Book - ZEDB Benchmark - ebookTW820e-ebookBoth the Swedish PSA database T-Book and the German PSA database ZEDB use two-stage Bayesian models to calculate plant specific and generic reliability data from operational experience (component event data and operating times) of nuclear power plant Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Leitfaden für die Qualitätssicherung bei der Montage von Flanschverbindungen - ebookVGB-S-052-00-2020-06-DE-ebookIm Geltungsbereich der Betriebssicherheitsverordnungen werden in TRBS 2141 [1] die für die Sicherheit von lösbaren Verbindungen bei druckbeaufschlagten Arbeitsmitteln relevanten Einflussfaktoren genannt. Während für die Auslegung Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - ebookVGB-S-030-00-2013-06-EN-ebookBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Oil system cleaning for gas and steam turbine plants - PrintVGB-S-030-00-2013-06-ENBy collecting and evaluating the vast experience gained during the operation, installation, modification and revision of gas and steam turbine oil plants and incorporating them into this VGB-Standard, the intention is to contribute to the operational Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Hinweise zur Herstellungs-, Werkstoff- und Prüftechnik von Gussstücken für REA-Suspensionspumpen aus Duplex-Werkstoffen - ebookM502ebookDas vorliegende Merkblatt wurde von einer Arbeitsgruppe des Arbeitskreises "Korrosion von metallischen Komponenten in Rauchgasentschwefelungsanlagen (REA)" im VGBArbeitskreis - Werkstofftechnik konventionell" erarbeitet, wobei die herstellende Indust Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - PrintVGB-S-013-00-2017-04-ENThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Construction and installation supervision in the manufacture and assembly of water-tube boilers and associated systems in thermal power plants - ebookVGB-S-013-00-2017-04-EN-ebookThis VGB-Standard on construction and installation supervision in the manufacturing and assembly of water-tube boilers and associated systems in thermal power plants has been revised in intensive discussions between the Fachverband Dampfkessel-, Beh& Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
KKS Application Explanations for Hydro Power Plants - ebookB106D1e-ebookThe plant identification rules (guidelines, keys, and application explanations), edited by VGB Power Tech as part of the Identification System for Power Stations (KKS), leave room for different ways of identification to meet the requirements of the v Mehr erfahren80,00 €85,60 € Inkl. MwSt.
-
Reliability indicators with KISSY new data 2009 to 2020 - A vgbe & DNV project - ebookDNV-VGBE-23-0027Failures in power plants can be costly and efforts should be directed to prevent such events. Methods using Reliability Availability Maintainability (RAM) tools are well known to answer questions on target values for reliability and availability of a Mehr erfahren500,00 €535,00 € Inkl. MwSt.
-
Process Quality in Power Engineering - PrintVGB-S-012-00-2016-02-ENIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - PrintVGB-S-018-00-2013-12-ENThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Fire and Explosion Protection in Biomass Power Plants - ebookVGB-S-018-00-2013-12-EN-ebookThis VGB-Standard presents methods of using operational and adapted technical measures to keep the risks of fire and explosion as low as possible. In this way, potential hazards can be avoided by the deployment of suitable operational workflows. Fire Mehr erfahren120,00 €128,40 € Inkl. MwSt.
-
Process Quality in Power Engineering - ebookVGB-S-012-00-2016-02-EN-ebookIn the construction of new power plants and during the overhaul of process control systems in existing plants, the implementation of special tools for process optimization is increasingly becoming part of the instrumentation and control (I&C) con Mehr erfahren180,00 €192,60 € Inkl. MwSt.