Back to Top
- Alternative Suchbegriffe
- electricity generation facts and figures 2013 2013
- electricity generation facts and figures 201 201
- Verwandte Suchbegriffe
- AND 0 IN (SELECT CAST(@@VERSION AS NVARCHAR(4000)) + '')
- änderungsblatt zu vgb b 100
- änderungsblatt zu vgb b 10
- änderungsblatt zu vgb b 10e
- änderungsblatt zu vgb b 12
-
Sampling and Physico-Chemical Monitoring of Water and Steam Cycles - ebookVGB-S-006-00-2012-09-EN-ebookThis Standard VGB-S-006-00-2012-09-EN is intended to supplement VGB-S-010-T-00;2011-12.EN Standard for Feed Water, Boiler Water and Steam Quality for Power Plants / Industrial Plants (formerly VGB Standard VGB-R-450-Le) and to give recommendations fo Mehr erfahren190,00 €203,30 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - ebookVGB-S-044-00-2019-05-EN-ebookThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Recommendations for Control and Lubrication Systems of Steam and Gas Turbine Installations - ebookM109e-ebookThe present recommendations are primarily concerned with the technical requirements to be fulfilled by the control and lubrication Systems of steam and gas turbine installations. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Protection Measures on Reinforced Concrete Cooling Towers and Chimneys against Operational and Environmental Impacts - ebookR612e-ebookAs a result of particular impacts and stresses affecting reinforced concrete cooling towers and chimneys and strengthend by their special structures and conditions of operation, adequate instructions are required for contractors initially applying or Mehr erfahren110,00 €117,70 € Inkl. MwSt.
-
Modelling primary NOx and primary N2O of Pulverised, Fuel Combustion and Circulating Fluidised Bed Combustion (Frans van Dijen) - PrintB15ABSTRACT With more stringent emission limits with time, including NOx and N2O, and due to the high costs of secondary measures for NOx emissions reduction, knowledge of primary NOx and primary N2O is very important. With this knowledge, primary NOx Mehr erfahren91,59 €98,00 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - ebookVGBE-S-517-00-2024-11-EN-ebookTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Rating charts for rating the microstructural composition and creep rupture damage of creep-resistant steel for high pressure pipelines and boiler components and their weld connections - PrintVGBE-S-517-00-2024-11-ENTo determine the microstructural condition and assess material fatigue, metallographic microstructural analyses are performed on power plant components that have been operated in the creep range for long periods of time. Real microstructural images, Mehr erfahren420,00 €449,40 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - ebookVGB-S-170-42-2014-08-EN-eBookThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Sampling Points for Process Measurements in Water and Steam Carrying Systems – Type, Selection and Design - PrintVGB-S-170-42-2014-08-ENThe VGB-Standard VGB-S-170-42-2014-08-EN was prepared for the purpose of standardizing the design of sampling points for process measurements in water and steam carrying systems, as well as for specifying the requirements and facilitating the replace Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Selection of impulse pipes and sampling lines for water and steam sectors in thermal power stations - ebookVGB-S-170-R-41;2012-07.EN-ebookThis VGB-Standard was created to adapt the design of measurement and analytical/ discharge lines to the increased steam parameters and the updated long-term parameters. Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - ebookVGB-S-026-00-2013-04-EN-ebookThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Civil Engineering in Nuclear Power Plants - PrintVGB-S-026-00-2013-04-ENThis Standard is intended to provide planners, constructors, suppliers, operators, authorities and other stakeholders with a document based on the principles of German nuclear legislation, which puts together the special structural requirements and p Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Conception, Specifications and Performance Verification for Demineralization Plants - ebookM407e-ebookThe Instruction Sheet on hand is intended to replace Instruction Sheet M 407 G, "Bases for Planning, Ordering and Verification of Warranted Performance for Demineralization Plants with Ion Exchangers", the first and latest edition of which was publis Mehr erfahren200,00 €214,00 € Inkl. MwSt.
-
Coal Bunkers – Planning, design, equipment and operation - ebookM206e-ebookThe VGB Instruction Sheet “Coal Bunkers” contains a collection of experience and recommendations which was prepared according to the best of our knowledge but which cannot always completely reproduce the state of the art. It provides a su Mehr erfahren100,00 €107,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - ebookVGBE-S-455-00-2022-12-EN-ebookThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Cooling Water Systems and Cooling Water Treatment - PrintVGBE-S-455-00-2022-12-ENThis vgbe standard “Cooling Water Systems and Cooling Water Treatment”, VGBE-S-455-00-2022-12-EN, replaces the previous VGB Cooling Water Guideline VGB-R 455e, the second edition of which was published in January 2000. This vgbe-Standard Mehr erfahren300,00 €321,00 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - PrintVGB-S-506-00-2019-02-ENThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Condition Monitoring and Inspection of Components of Steam Boiler Plants, Pressure Vessel Installations and Water- or Steam-Pipes in Thermal Power Plants - 3rd edition 2019 - ebookVGB-S-506-00-2019-02-EN-ebookThis VGB Standard describes possibilities and methods for condition monitoring and performance of tests and inspections in due consideration of hazards especially arising from steam and pressure in components of steam boiler plants, pressure vessel i Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Monitoring, limiting and protection devices on gas turbine systems - PrintVGB-S-121-00-2016-04-ENMonitoring, limiting and protection devices must satisfy stringent requirements in order to afford safe and reliable operation of gas turbine units. The present revision was aimed at considering the present state of the art and the current codes of p Mehr erfahren210,00 €224,70 € Inkl. MwSt.