Back to Top
- Verwandte Suchbegriffe
- behaviour of st eas in open or cooled system
- behaviour of st ess in open or cooled system
- behaviour of st ea in open or cod system
- behaviour of st ea in open or codes system
- behaviour of st ea in open or cd system
-
Recommendations for managing functional safety in steam boiler plants and systems of the water/steam cycle - 2nd revised edition (2020) - ebookVGB-S-008-00-2020-11-EN-ebookThe VGB standard addresses operators of thermal power plants as well as manufacturers and is intended to provide assistance in the application of the standards on functional safety. Mehr erfahren390,00 €417,30 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - PrintVGB-S-042-00-2018-01-ENThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Chemical Feeding and Feed Systems for Water/Steam Circuits - ebookVGB-S-042-00-2018-01-EN-ebookThe aim of the VGB-Standard VGB-S-042-0-2018-01-EN is to specify and explain methods and systems for the chemical treatment of make-up water, boiler feed water, steam and condensate for the operation of water/steam cycles. Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Corrosion Protection for Offshore Wind Structures - Part 1 to Part 3 (2023), and Part 4 (2018) [free of charge] - ebookVGBE-S-021-XX-YYYY-MM-EN-ebookCorrosion Protection for Offshore Wind Structures - Part 1: General. Part 2: Requirements for Corrosion Protection Systems. Part 3: Application of Coating Systems. Part 4: Cathodic Protection (CP) Mehr erfahren0,00 €0,00 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants Henk C. Wels, - ebookB035ebookPower plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Failures and Forced Unavailability of Power Plants (Henk C. Wels, print) - PrintB035Power plants are not functioning to the fullest 100 % of the time. Maintenance and inspection of some components require them to be off-line in time, however, this can be planned such that customers continue receiving power from the electrical grid, Mehr erfahren48,00 €51,36 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - PrintVGB-S-168-00-2013-12-ENThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Implementation guideline for motors and variable-speed power drive systems - ebookVGB-S-168-00-2013-12-EN-ebookThe aim of this VGB Standard is to provide an effective aid to the parties involved in the planning and specification of motors and variable-speed power drive systems (especially design engineers, operators and manufacturers) by means of extensive ha Mehr erfahren250,00 €267,50 € Inkl. MwSt.
-
Operational safety in electrotechnology - ebookVGB-S-163-00-2015-07-EN-ebookThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Operational safety in electrotechnology - PrintVGB-S-163-00-2015-07-ENThe purpose of this VGB-Standard is, with respect to the electrotechnical systems and components of a power plant, to set out what essential rules should prevail regarding their characteristics and operation, and how these can be applied for purposes Mehr erfahren240,00 €256,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2013 – 2022, Edition 2023 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2023-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2023) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2014 – 2023, Edition 2024 (KISSY database evaluation) - ebookVGBE-TW-103Ae-2024-ebookSince 1970 vgbe/VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2024) presents the analysis about unavailability of Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - PrintVGB-S-040-00-2017-03-ENThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Prequalification of Partner Companies for High-Quality Maintenance - ebookVGB-S-040-00-2017-03-EN-ebookThis VGB-Standard for the prequalification of external/partner companies serves to ensure the quality expected or demanded by the client. The market situation forces the contractors (manufacturers and fabricators) to offer their products and service Mehr erfahren320,00 €342,40 € Inkl. MwSt.
-
Analysis of Unavailability of Power Plants 2012 – 2021, Edition 2022 (KISSY database evaluation) - ebookVGB-TW-103Ae-2022-ebookSince 1970 VGB has collected data about power plants based on standardized definitions, calculation methods, and recording procedures, among others in the database KISSY. This report (edition 2022) presents the analysis about unavailability for the Mehr erfahren340,00 €363,80 € Inkl. MwSt.
-
Impact Grindability Index PMI - ebookR211e-ebookThis instruction sheet applies to the characterisation of the grindability of lignites according to the Impact Grundability Index PMI (in German: Prallmahlindex PMI). This process variable characterises the grindability of pulverised fuels under the Mehr erfahren140,00 €149,80 € Inkl. MwSt.
-
Guideline for Design and Purchase of Spring Elements for Machine Foundations - ebookR603e-ebookThis guideline applies to spring elements for foundations in accordance with: - DIN 4024-1 Machine foundations; flexible structures that support machines with rotating elements - DIN 4024-2 Machine foundations; rigid foundations for machinery Mehr erfahren40,00 €42,80 € Inkl. MwSt.
-
Analysis of FGD Gypsum - ebookM701e-ebookThe first edition of the instruction sheet “Analysis of FGD gypsum” was elaborated and published by the joint Working Group of the "Bundesverbandes der Gipsindustrie e.V." and VGB PowerTech e.V. to assure a high quality of FDG gypsum in c Mehr erfahren60,00 €64,20 € Inkl. MwSt.
-
-
Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants - PrintVGB-S-044-00-2019-05-ENThe VGB-Standard in hand, “Life Cycle Management of Buildings and Structures in Industrial Facilities and Power Plants”, follows the VDI Standard 6200 and the requirements described therein. The VGB-Standard clarifies and extends these re Mehr erfahren240,00 €256,80 € Inkl. MwSt.